Documents filed under Impact on Bats

Maple Ridge Wind Power Avian and Bat Fatality Study Year One Report FINAL REPORT

Mapleridgereportfall2006final_thumb The following report describes the research design, initiation and completion of the first year of postconstruction study (fall migration only) of avian and bat collision fatalities at the 120 turbine Maple Ridge Wind Power Project in Lewis County, New York. The work was conducted in accordance with the “Proposed Scope of Work for a Postconstruction Avian and Bat Fatality Study at the Maple Ridge Wind Power Project, Lewis County, New York” dated March 14, 2006, and agreed upon in mid-May 2006, after several revisions. People/agencies who reviewed the proposed scope of work included staffers from the U. S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (ACE), Environmental Design and Research (EDR), NYS DEC staffers, developers (PPM and Horizon), and others. Representatives from some or all of these groups have been included in a Technical Advisory Committee (TAC), which has the responsibility of reviewing and commenting on progress reports, annual reports, and other updates from this project.
25 Jun 2007

NY DEC comments on DGEIS for Horse Creek wind power project

Nysdec_ppmjefferson_thumb The New York State Department of Environmental Conservation (DEC) reviewed the Draft Generic Environmental Impact Statement (DGEIS) for PPM's Horse Creek wind facility proposed for the New York towns of Clayton and Orleans, Jefferson County. The project consists of approximately 62 wind turbines (130 MW) with 54 turbines in the Town of Clayton and 8 turbines in the Town of Orleans. The project scope also includes construction of two permanent meteorological (met) towers, an operations and maintenance facility, approximately 16 miles of gravel access roads and approximately 28 miles of buried electric collection lines, and an interconnection substation adjacent to the existing electric transmission line.
15 Jun 2007

Biological Survey responds to PA Game Commission wind energy voluntary cooperation agreement

Review_of_pgc_wind_energy_agreement_mtc_of_pa_biological_survey_thumb This report, authored by the Wind Energy and Bats subcommittee to the Pennsylvania Biological Survey's (PaBS) Mammal Technical Committee, documents the PA Game Commission's direct side-stepping of a long-established memorandum of agreement with the PaBS when the Game Commission developed and finalized the Wind Energy Voluntary Cooperation Agreement without the review or input of the Biological Survey. The memorandum of agreement was created over 10 years ago to help ensure that the Game Commission obtained advice from experts about actions affecting the mammals inhabiting the Commonwealth.
1 Jun 2007

USFWS Letter to UPC Re. Proposed Sheffield Wind Plant

Usfws_letter_re_sheffield_project_thumb As a general comment, the Service appreciates the fact that UPC Wind has conducted radar and acoustic studies on bird and bat migration and bat activity at Hardscrabble Mountain and other locations at or near the proposed project. We believe the radar, visual, and acoustic information contained in the above-referenced reports is useful, but that it is not sufficient to demonstrate, at an appropriate scale, the spatial and temporal uses of the airspace over Granby, Libby, Barrett, and Norris Mountains by birds, bats, and insects.
3 Jan 2007

Virginia Department of Game and Inland Fisheries' Comments to the State Corporation Commission concerning the proposed industrial wind plant in Highland County

Dgif-092006_thumb To reiterate, if the SCC chooses to license this project, we request adherence to the monitoring and mitigation recommendations described in this letter and attachments. In the absence of such conditions, we feel this project would pose an unacceptable risk to the Commonwealth’s wildlife resources.
20 Sep 2006

Avian Risk Assessment - Various

Easthaven_ehwf-pk-2_thumb Below are two Phase I Avian Risk Assessments reports, prepared by Paul Kerlinger, for Vermont's East Haven Wind Farm (July 2003) and New Hampshire's Lempster Mountain Wind Power Project (June 2005). Phase I assessments have proven inadequate in assessing mortality at several sites in the U.S. including Mountaineer in West Virginia and Meyersdale in Pennsylvania. The US Fish and Wildlife Interim Wind/Wildlife Guidelines calls for multi-year evaluation of avian and bat activity using remote sensing.
7 Aug 2006

Lempster Wind Project: USFWS Letter to Community Energy

Starting with our first interagency meeting on April 8, 2005, we have generally discussed three broad categories of activities that pose a potential concern for fish and wildlife resources. These include the potential for bird and bat collisions with turbines, habitat fragmentation effects on wildlife and impacts to waters/wetlands. At the April 8, 2005 interagency meeting, we recommended that CEI collect three (3) years of radar data on spring and fall bird/bat migrations to document the spatial and temporal use of the airspace by these flying vertebrates. Three years of radar data should be sufficient to gather information on the spatial and temporal distribution of birds in the airspace, including the year-to-year variability in migration patterns at this site, and represent our normal request for these data at wind projects. We have consistently requested that this data be collected at our meetings and field visits and continue to make this request for radar information.
28 Jul 2006

Vermont PSB Denies 'Certificate of Public Good' to East Haven Project

6911fnl_thumb ORDER IT IS HEREBY ORDERED, ADJUDGED AND DECREED by the Public Service Board of the State of Vermont that: 1. The findings, conclusions and recommendations of the Hearing Officer are hereby adopted, as modified above. 2. The proposed Project will not promote the public good of the State of Vermont, and a certificate of public good shall not be issued pursuant to 30 V.S.A. § 248. Dated at Montpelier, Vermont, this 17th day of July , 2006.
17 Jul 2006

The Wayward Wind

Silver_lake_speech_thumb Because time seems to be running out on fossil fuels and the lure of non-polluting windpower is so seductive, some people are now promoting windpower initiatives at any cost, without investigating potential negative consequences-- and with no apparent knowledge of even recent environmental history......Throughout my experience, I could not substantiate a single claim developers made for industrial wind energy, including the one justifying its existence: that massive wind installations would meaningfully reduce our reliance on fossil fuels. When you understand this, you realize the wind business is not really that complex. But there are a lot of complicated issues swirling around it that obscure and distract from this main point, issues such as global warming, property values, the nature of wind leases, local revenues and taxes, wildlife, natural views, and a host of others. So how does one know the truth of it all? How does one go about separating the reality from spin?
19 Jun 2006

Documentation Related to the Proposed Bald Hills Wind Farm, Victoria, Australia

Belinda_appleton_'s_statement_of_evidence_bats_thumb Compliments of Andrew Chapman, the attached pdf files contain extensive documentation particularly with respect to the impact of wind turbines on wildlife as part of an ongoing effort to prevent the construction of the Bald Hills Wind Farm, South Gippsland, Victoria. While it has been approved by the Victorian State Government the presence in the Bald Hills area of migratory species of national and international significance that are protected by treaties with Japan and China in the Bald Hills has placed the final decision in the hands of the Federal Government. This decision is pending.
9 Mar 2006

Impacts of Wind Energy Development on Wildlife - Key Issues of Concern

We believe that wildlife kills can be prevented or minimized, and we advocate broad collaboration to achieve this end. However, until reliable solutions are developed, high risk areas should be avoided. These include locations along major migratory corridors or within the normal flight range of large roosting and feeding aggregations of birds or bats.
6 Jan 2006

A Radar and Visual Study of Nocturnal Bird and Bat Migration at the Proposed Highland New Wind Development Project, Virginia, Fall 2005

Radar_study_thumb This study focused on nocturnal migration patterns and flight behaviors during the peak periods of passerine and bat migration during fall 2005 at the proposed Highland New Wind Development in Highland Count. Virginia. The key results of our study were: (I) the mean overall fall passage rate was 385 targetsikmh; (2)mean nightly passage rates ranged from 9 to 2,762 targetshh, (3) the percentage of targets passing below 125 m agl was 11.5%; (4) the estimated turbine passage rate of nocturnal migrants passing within the airspace occupied by each proposed turbine was 3.4-24.7 migrantslturbineid during the fall study period; (5) fall migrants flying at or below maximal turbine height consisted of 88% birds and 12% bats; and (6) passage rates, flight altitudes, and visual observation rates of birds and bats did not differ between the two survey sites within the project area.
6 Jan 2006