Final Report of the Township of Lincoln Wind Turbine Moratorium Committee

Excerpts of the report are provide here. The full report is also available by clicking the documennt link on this page.at the bottom of this page. After the wind turbines went online in Kewaunee County, Wisconsin, the Lincoln Township Board of Supervisors approved a moratorium on new turbine construction. The purpose of the moratorium was to delay new construction of wind turbines for eighteen months, giving the township the opportunity to assess the impacts of the turbines installed by Wisconsin Public Service Corporation (WPSC) and Madison Gas and Electric (MG&E), which went online in June 1999.

 

Excerpt

The following document summarizes some of the problems the Moratorium Committee faced in trying to address problems the township hadn't faced prior to turbine construction and some of the resulting changes the committee proposed as a result of its study. Verification of this information can be obtained from Lincoln Township officials.

Agenda. The Moratorium Committee met 39 times between January 17, 2000, and January 20, 2002, to (1) study the impact of wind factories on land, (2) study the impact on residents, and (3) review conditional use permits used to build two existing wind factories in Lincoln Township.

Survey. The committee conducted a survey on the perceived impacts of the wind turbines that was sent out to all property owners residing in the township. Each household received one vote. The results were presented on July 2, 2001, to the town board, two years after the wind factory construction.

Life_near_wind_turbines_thumb
Life Near Wind Turbines

Download file (45 KB) pdf

Lincoln_township-full_moratorium_report_thumb
Lincoln Township Full Moratorium Report

Download file (7.17 MB) pdf