Picture

Texas Turbine Fire

A wind turbine caught fire in southwest Taylor County in Texas. Crews worked through the night to contain the flames but it had already spread to 200 acres and was only contained by 50%. The fire appears to be caused by turbines at the Buffalo Gap wind energy facility located SSW of Mulberry Canyon. Buffalo Gap was built in three phases beginning in 2006. Phase I consists of 67 Vestas V80 turbines for a total capacity of 120.6 MW. Phases II and III include 155 GE SLE turbines and 74 Siemens turbines. The total installed capacity for the three phases is 523.2 MW. The fire is being called the Rhodes Ranch 3 fire. The Rhodes Ranch 1 fire, which happened in 2009 and burned 2000 acres, was also caused by a wind turbine. Buffalo Gap is owned and operated by AES Wind Energy.


Source: https://www.facebook.com/Vi...

AUG 27 2019
http://www.windaction.org/posts/50234-texas-turbine-fire
back to top