logo
Article

Wind turbine blades collapse in grounds of insurance giant

ReCharge News|Andrew Lee|Sep 12, 2025
United Kingdom (UK)SafetyStructural Failure

An investigation is underway after wind turbine blades fell to earth in the grounds of a UK insurance giant. All three blades detached from the turbine at the offices of Aviva in Perth, Scotland.


Aviva says investigation underway as locals report 'almighty crack'

An investigation is underway after wind turbine blades fell to earth in the grounds of a UK insurance giant.

All three blades detached from the turbine at the offices of Aviva in Perth, Scotland.

Nobody was injured in the incident as local residents reported hearing “an almighty crack” in the early hours of Friday.

“The blade snapped off the wind turbine and there's a huge lump of ragged and twisted metal that fell meters away from the public path," one told The Daily Record newspaper.
Aviva installed the turbine – according to information online a 1MW DW61 machine with a 77-metre tip height from Dutch-based manufacturer EWT – 10 months ago.

Aviva said the blade failure …

... more [truncated due to possible copyright]

Aviva says investigation underway as locals report 'almighty crack'

An investigation is underway after wind turbine blades fell to earth in the grounds of a UK insurance giant.

All three blades detached from the turbine at the offices of Aviva in Perth, Scotland.

Nobody was injured in the incident as local residents reported hearing “an almighty crack” in the early hours of Friday.

“The blade snapped off the wind turbine and there's a huge lump of ragged and twisted metal that fell meters away from the public path," one told The Daily Record newspaper.
Aviva installed the turbine – according to information online a 1MW DW61 machine with a 77-metre tip height from Dutch-based manufacturer EWT – 10 months ago.

Aviva said the blade failure appeared to be the result of “some type of engineering fault”.

“The area has been secured, and we are working with the supplier to establish the root cause of this incident, as well as on a plan to repair the turbine and restore it safely to operation,” the insurance giant added.

“As part of the repair and recovery operation, the wind turbine tower will be taken down in the near future, likely over this weekend, weather permitting. This will enable us to expedite our investigation in terms of what went wrong and start developing a plan to restore the turbine to full operation as quickly as possible.”

The installation of the turbine was part of a wider project to boost the Perth site’s renewable energy use that also included deployment of solar panels and battery storage.

The turbine was inaugurated by Scotland’s first minster, John Swinney.


Source:https://www.rechargenews.com/…

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2026 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION