logo
Document

Chief of Naval Operations (N4) VADM W. R. Burke memo on impacts of turbines on navy missions

W. R. Burke|Jul 13, 2011
USATexasSafety

Chief of Naval Operations (N4) VADM William R. Burke, USN (now retired) issued this important memo in 2011 seeking information on the impacts of wind farm development around the Naval Air Station Kingsville (NASK) in Texas. The memo also seeks information on the feasibility and cost of mitigating for the impacts, including moving the NASK missions to other locations. The full memo is provided below. The memo and response can be downloaded from the document links on this page. 


DEPARTMENT OF THE NAVY
OFFICE OF THE CHIEF OF NAVAL OPERATIONS 
2000 NAVY PENTAGON 
WASHINGTON, DC 20350-2000    

iN REPLY REFER TO: 5090 Ser N4/

From: Chief of Naval Operations (N4)
To:    Commander, U.S. Pacific Fleet
Commander, Naval Installations Command

Subj: WIND TURBINE ENCROACHMENT AT NAVAL AIR STATION KINGSVILLE, TEXAS

  1. This letter requests your assistance in evaluating and justifying the risk to readiness presented by proposed construction of additional wind turbines in the vicinity of NAS Kingsville..    
  2. Per the 2011 National Defense Authorization Act (NDAA), a DoD objection to a renewable energy project cannot be registered unless SECDEF or his designee determines that the project would result in an unacceptable risk to the national security of the United States. This determination must be supported by a report to Congress explaining the readiness impacts that led to the determination; discussion of mitigation options considered; and an explanation of why the mitigation measures were not feasible or did not resolve the conflict.
  3. I request that PACFLT, in coordination with CNAF and CNATRA, assess the impacts of wind turbine development near NAS Kingsville on Navy readiness and advise whether such impacts, if unmitigated, would present an unacceptable risk to National Security. I also request that PACFLT and CNIC identify and assess the feasibility and cost of all possible mitigation options. such as technological improvements. training procedure  modifications. siting the wind turbines so as to minimize  mission impacts, relocating some or all of NAS Kingsville’s mission to other installations, and purchasing easements to prevent incompatibility development. Please provide the readiness and mitigation assessment by 31 July 2011.
  4. My point of contact is RADM Philip Cullom, at (703) 695-5029.

W. R. BURKE

Attachments

Burke Memo And Response Impacts Of Wind Development Near Nask Texas

Jul 14, 2024

Open (79.9 kB).pdf

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2026 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION