logo
Article

Wind turbine explodes after bursting into flames at quiet Welsh farm, showering broken parts to the ground

Daily Mail|Megan Howe|Jan 29, 2024
United Kingdom (UK)SafetyStructural Failure

Walkers enjoying a quiet stroll in the Welsh countryside captured a shocking sight on Sunday, after a wind turbine burst into flames before exploding. Nick Blasdale, 61, and his wife Alison, 59, were left stunned when they saw burning parts of a turbine fall more than 100ft to the ground.


Firefighters were called to the blaze at Blaen Bowi Wind Farm on Sunday  

Walkers enjoying a quiet stroll in the Welsh countryside captured a shocking sight on Sunday, after a wind turbine burst into flames before exploding.

Nick Blasdale, 61, and his wife Alison, 59, were left stunned when they saw burning parts of a turbine fall more than 100ft to the ground.

Firefighters were called to the blaze at Blaen Bowi Wind Farm near Newcastle Emlyn, Pembrokeshire at 11.46am, but could only watch and make sure passersby didn't get too close.

Alison said: 'We watched the top section burst into flames then drop off whilst still burning then explode when it hit the ground.'

Firefighters were called to the blaze at 11.46am on Sunday

A lease for the …

... more [truncated due to possible copyright]

Firefighters were called to the blaze at Blaen Bowi Wind Farm on Sunday  

Walkers enjoying a quiet stroll in the Welsh countryside captured a shocking sight on Sunday, after a wind turbine burst into flames before exploding.

Nick Blasdale, 61, and his wife Alison, 59, were left stunned when they saw burning parts of a turbine fall more than 100ft to the ground.

Firefighters were called to the blaze at Blaen Bowi Wind Farm near Newcastle Emlyn, Pembrokeshire at 11.46am, but could only watch and make sure passersby didn't get too close.

Alison said: 'We watched the top section burst into flames then drop off whilst still burning then explode when it hit the ground.'

Firefighters were called to the blaze at 11.46am on Sunday

A lease for the wind turbines was signed in 1995 before the turbines became operational in 2002.

The 1.3 megawatt turbines at the site are expected to produce enough electricity to power around 2,000 homes a year.

Mid and West Wales Fire Service said: 'Crews responded to a wind turbine which was well alight on their arrival.

'Pieces of the wind turbine were falling nearby and crews monitored the condition of the debris.

'No further action was taken by crews and the landowner continued to monitor for fire spread and falling debris.'

Fire crews responded at 11.46am and left at 1.03pm. 


Source:https://www.dailymail.co.uk/n…

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2026 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION