logo
Video

Adair County Iowa Arbor Hill industrial wind turbine blade failure

Shelley Marsh|September 17, 2020
IowaSafetyStructural Failure

MidAmerican's Arbor Hill wind energy facility suffered a failure when a portion of a 177-foot long blade broke off the turbine and was flung onto another farmer's property. A similar blade break occurred at a month later at the Beaver Creek wind farm, also owned and operated by MidAmerican. Both the Arbor Hill and Beaver Creek facilities have Vestas V110 2.0 MW turbines installed.



Source:https://www.youtube.com/watch…

Share this post
Follow Us
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2022 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION