logo
Video

Fire sparked by a wind turbine

July 22, 2019
WashingtonSafetyEnergy Policy

The turbine that sparked the fire was part of the Juniper Canyon facility located in Klickitat County in Washington State. The project, which is owned and operated by Iberdrola Renewables (now Avangrid), was constructed in two phases during the period from 2010 to 2012. It consists of 128 turbines (63 in Phase 1; 65 in Phase 2) and has a total installed capacity of 251.2 MW.



Share this post
Follow Us
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2022 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION