Library filed under Zoning/Planning from Vermont

Notice Letter to Town of Londonderry and Overview of Proposed Glebe Mountain Wind Project

Catamount_notice_12-2005_thumb The wind turbine array will be located within a 1200 foot wide Project corridor that extends approximately 3.7 miles along the Glebe Mountain ridge. Editor's Note: The cover letter is provided below. The pdf file provides an overview of the proposed project. Photos of the preliminary site plan and the overall facilities plan follow the cover letter. Both are also available in NWW's photo gallery.
1 Dec 2005

Wind Opponents Want Changes - NEK Gets Another Chance To React To Regional Plan Draft

NORTHEAST KINGDOM -- Kingdom residents will have another opportunity to comment on a proposed regional plan that supports wind power as a renewable energy source but leaves decisions up to individual towns. A second hearing on the draft plan is Tuesday, Dec. 6, at 7 p.m. in the Lyndon Institute cafeteria. The deadline for written comment is also Dec. 6.
29 Nov 2005

Sheffield wind project presents latest plans

SHEFFIELD – Officials behind a major wind project proposed here unveiled more details of their plans Thursday evening, meeting with the planning commission as required by the state law that regulates energy projects. Massachusetts-based UPC Wind Management presented the update, bringing in its president, power sales director, project manager, lawyer, publicist and environmental consultant. They were joined by Avram Patt, general manager of East Montpelier-based Washington Electric Co-op.
20 Nov 2005

Wind not a stormy issue in Readsboro, Searsburg

READSBORO — Officials from the two towns most affected by a proposed wind facility met on Wednesday night to discuss the economic impacts of a 30-turbine development. The Readsboro and Searsburg Select Boards met in the Central School gym to discuss the financial benefits and strains that can be expected by a town hosting a wind farm. Robert Ide of the Vermont Department of Public Service attended, as did about 10 residents. Searsburg is now the home of the state's only existing commercial wind facility. There are 11 turbines producing about 6 megawatts of electricity. A 30- to 45-megawatt plant with 20 to 30 new turbines has been proposed for ridgelines spanning both Readsboro and Searsburg.
17 Nov 2005

Reply Submitted By The Kingdom Commons Group to Vermont's Public Service Board re. East Haven

Response_to_prop_fof_and_col_1__thumb There is no question in this proceeding that EMDC bears the burden of proof with regard to each of the criteria for a Certificate of Public Good ("CPG") under 30 V.S.A. Section 248. See In Re: Petition of Tom Halnon, 174 Vt 514; 811A. 2d 161, (August 20, 2002); Petition of Vermont Gas Systems, Inc., Docket No. 5314 at p.17 (August 2, 1989); Petition of Champlain Pipeline Company, Docket No. 5300 at p. 32-33 (August 21, 1989); Petition of David and Jan Blittersdorf, CPG NM-11 at p. 3 (May 26, 2000). ("The Board has consistently held in cases under Section 248 that the burden of proof is on the applicant.")
27 Oct 2005

Jurisdictional Ruling by Vermont's Environmental Board

Jurisdictionalopinion2-227_thumb The Windham Regional Commission asked the District Environmental Commission if the proposed commercial wind energy development on Glebe Mountain requires an an Act 250 amendment as well as a permit under Section 248 (30 V.S.A Section 248). Act 250 is designed to protect Vermont's ridgelines above 2500'. Section 248 authorizes the Public Service Board to issue 'Certificates of Public Good' for electricity generating projects. The District Environmental Commission concluded that construction of the wind measurement towers and the proposed wind energy project represent material and substantial changes to existing Act 250 permits and thus require an amendment.
6 Oct 2005

Londonderry Town Plan

Culminating three years of study, the Planning Commission of Londonderry (VT) revised Londonderry's Town Plan to prohibit industrial wind turbines on Glebe Mountain. The revised Town Plan was submitted to the Londonderry Select Board on August 30, 2005 and approved by the Select Board on October 5, 2005. Included here are selected themes and extracts from Londonderry's Town Plan.
30 Aug 2005

Friction over forest

It's not easy to strike a balance, and that's where the friction arises. In Vermont, it is playing out as the U.S. Forest Service is faced with delivering a new management plan for the Green Mountain National Forest, a 400,000-acre parcel of public land in central and southern Vermont.
21 Aug 2005

https://www.windaction.org/posts?location=Vermont&p=8&topic=Zoning%2FPlanning
back to top