Documents filed under Impact on Wildlife from USA

Army Corps letter to Sheffield Wind regarding individual wetlands permit application

Acesheffieldletter_thumb Army Corps' letter to UPC Wind states that the Sheffield Wind project "is not eligible for authorization under the VT General Permit, and must be reviewed under the individual permit review procedure." The letter further states that UPC Wind "may not proceed with any proposed work within our jurisdiction until you have received written authorization from this office." The full letter can be accessed by clicking on the link below.
23 Aug 2007

Maple Ridge Wind Power Avian and Bat Fatality Study Year One Report FINAL REPORT

Mapleridgereportfall2006final_thumb The following report describes the research design, initiation and completion of the first year of postconstruction study (fall migration only) of avian and bat collision fatalities at the 120 turbine Maple Ridge Wind Power Project in Lewis County, New York. The work was conducted in accordance with the “Proposed Scope of Work for a Postconstruction Avian and Bat Fatality Study at the Maple Ridge Wind Power Project, Lewis County, New York” dated March 14, 2006, and agreed upon in mid-May 2006, after several revisions. People/agencies who reviewed the proposed scope of work included staffers from the U. S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (ACE), Environmental Design and Research (EDR), NYS DEC staffers, developers (PPM and Horizon), and others. Representatives from some or all of these groups have been included in a Technical Advisory Committee (TAC), which has the responsibility of reviewing and commenting on progress reports, annual reports, and other updates from this project.
25 Jun 2007

WV PSC Order to deny Liberty Gap wind project

Ord20070622154826_thumb By the reasons set forth in this order of Jun 22, 2007, the West Virginia Pubic Service Commission refused to issue a siting certificate to Liberty Gap Wind Force, LLC (Liberty Gap) to construct a wind turbine electric generating facility (Project) in Pendleton County, West Virginia. The applicant, US Wind Force, LLC, a Delaware limited liability company, had proposed constructing up to 50 wind turbines. The total output of the project would be up to 125 megawatts.
22 Jun 2007

NY DEC comments on DGEIS for Horse Creek wind power project

Nysdec_ppmjefferson_thumb The New York State Department of Environmental Conservation (DEC) reviewed the Draft Generic Environmental Impact Statement (DGEIS) for PPM's Horse Creek wind facility proposed for the New York towns of Clayton and Orleans, Jefferson County. The project consists of approximately 62 wind turbines (130 MW) with 54 turbines in the Town of Clayton and 8 turbines in the Town of Orleans. The project scope also includes construction of two permanent meteorological (met) towers, an operations and maintenance facility, approximately 16 miles of gravel access roads and approximately 28 miles of buried electric collection lines, and an interconnection substation adjacent to the existing electric transmission line.
15 Jun 2007

Biological Survey responds to PA Game Commission wind energy voluntary cooperation agreement

Review_of_pgc_wind_energy_agreement_mtc_of_pa_biological_survey_thumb This report, authored by the Wind Energy and Bats subcommittee to the Pennsylvania Biological Survey's (PaBS) Mammal Technical Committee, documents the PA Game Commission's direct side-stepping of a long-established memorandum of agreement with the PaBS when the Game Commission developed and finalized the Wind Energy Voluntary Cooperation Agreement without the review or input of the Biological Survey. The memorandum of agreement was created over 10 years ago to help ensure that the Game Commission obtained advice from experts about actions affecting the mammals inhabiting the Commonwealth.
1 Jun 2007