Wind farm owner sues Duke Energy Indiana

Many of the details of Duke Energy’s alleged contract breach are redacted in the 23-page complaint. But those that aren’t allege the utility’s actions have resulted in the wind farm “frequently” being forced to curtail operations, causing sharp reductions in the farm’s electrical output and revenue.
27 Dec 2013

Wind farm says Duke violated contract

When bids are too high, MISO’s automated system electronically signals the energy producer—in this case, the Benton County Wind Farm—and tells it to reduce its output. The lawsuit redacts what Duke specifically did, only noting the utility “curtail[ed] electrical production by refusing to offer the Wind Farm’s power to MISO at competitive prices and then refusing to compensate [the wind farm] when the Wind Farm is directed by MISO not to produce power.”
21 Dec 2013

Prairie Breeze Wind Farm land lease and easement agreement

Prairiebreezelandlease_thumb This document details the land lease agreement between host landowners in Tipton County Indiana and juwi Wind LLC, the German company proposing to erect up to 94 industrial scale wind turbines for a total installed capacity of 150 megawatts. The full lease agreement can be accessed by clicking on the link at the bottom of this page.
27 Jul 2013