logo
Article

Wind turbine proposal under FAA review

The Alpena News|Crystal Nelson |March 11, 2020
MichiganGeneral

ROGERS CITY — The Federal Aviation Administration is evaluating whether proposed wind turbines in Moltke Township would obstruct air traffic at the Rogers City Airport.

The FAA is evaluating 46 potential wind turbine locations, Presque Isle County Airport Manager Alan Stiller said. Stiller said he was told by the proposed wind turbine developers there would be 66 wind turbine locations.

The FAA performs obstruction evaluations whenever a tall structure is planned within a 25-mile radius of the airport. He said a permit must be filed with the FAA for any structures that would exceed 200 feet.

The proposed wind turbines would be 574 feet tall, according to the FAA.

“All of these towers have the potential to penetrate the airspace,” …

... more [truncated due to possible copyright]

ROGERS CITY — The Federal Aviation Administration is evaluating whether proposed wind turbines in Moltke Township would obstruct air traffic at the Rogers City Airport.

The FAA is evaluating 46 potential wind turbine locations, Presque Isle County Airport Manager Alan Stiller said. Stiller said he was told by the proposed wind turbine developers there would be 66 wind turbine locations.

The FAA performs obstruction evaluations whenever a tall structure is planned within a 25-mile radius of the airport. He said a permit must be filed with the FAA for any structures that would exceed 200 feet.

The proposed wind turbines would be 574 feet tall, according to the FAA.

“All of these towers have the potential to penetrate the airspace,” Stiller said.

Stephen Gust, president of Sstar Ridge-Run Energy, backers of the proposed wind turbines, could not be reached for comment on Monday.

FAA spokesman Tony Molinaro said the evaluations would determine whether a structure would obstruct airplanes flying into or out of the airport.

Molinaro said Presque Isle County officials would still determine whether the wind turbine project goes forward, but, “if it’s an issue where it could change a flight pattern or not allow an airport to use a runway, we make sure the airport knows that, and any kind of local officials know that, so they can make the proper decision.”

Molinaro said a permit has to be filed with the FAA for each wind turbine site because every location has its own coordinates and each of those sites are evaluated individually. He said it could be “a few months” before the FAA’s evaluation is complete.

Stiller said the proposed turbines cover an area in Moltke Township about 12 miles long near Knaebe’s Mmmunchy Krunchy Apple Farm. He said the proposed locations run north to south, with a few of the sites north of M-68 and a few south of M-68.

Presque Isle County Building and Zoning Official Mike Libby said the county has not received any formal plans from the developers. Libby said the county will need documents for engineering, the site plan to ensure the project meets all setbacks, and a building permit for each wind turbine.


Source:https://www.thealpenanews.com…

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2024 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION