logo
Video

Juniper Canyon wind turbine fire

YouTube|Kate Watson|July 20, 2019
WashingtonSafetyStructural Failure

The turbine on fire is part of the Iberdrola (now Avangrid) Juniper Canyon wind energy facility sited in Klickitat County, Washington. The project is owned and operated by Iberdrola Renewables (now Avangrid) and consists of 128 turbines (63 in Phase 1; 65 in Phase 2) for a total installed capacity of 251.2 MW. - dont like music



Source:https://www.youtube.com/watch…

Share this post
Follow Us
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2022 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION