Picture

Iberdrola's Groton Wind facility cuts into the ridgeline

This image of Iberdrola's Groton Wind project in Groton NH shows a 60-70 foot ledge cut into the ridgeline. The project consists of 24 Gamesa 2.0 MW towers (48 MW total). The facility is scheduled to go online before December 31, 2012 in order to receive at least $30 million in federal cash grant money.

AUG 29 2012
https://www.windaction.org/posts/35666-iberdrola-s-groton-wind-facility-cuts-into-the-ridgeline
back to top