House of Lords: A bill to make provision for a minimum distance between wind turbines and residential premises according to the size of the wind turbine; and for connected purposes.


A bill to make provision for a minimum distance between wind turbines and residential premises according to the size of the wind turbine; and for connected purposes.

Be it enacted by the Queen’s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:—

1.  Planning permission

(1) No relevant authority may grant planning permission for the construction of a wind turbine generator unless it meets the minimum distance requirement under section 2, subject to the exception in section 3.

(2) “Relevant authority” means the local authority or government department with the power to grant planning permission for a wind turbine generator.

2.  Requirements for minimum distance

(1) The “minimum distance requirement” means the necessary minimum distance between the wind turbine generator and residential premises as set out in subsection (4).

(2) “Residential premises” means any premises the main purpose of which is to provide residential accommodation, including farmhouses.

(3) If a number of wind turbine generators are being built as part of the same project the minimum distance requirement applies to each wind turbine generator individually.

(4) If the height of the wind turbine generator is—

(a) greater than 25m [82 feet], but does not exceed 50m [164 feet], the minimum distance requirement is 1000m [3280 feet = 0.62 mile];

(b) greater than 50m [164 feet], but does not exceed 100m [328 feet], the minimum distance requirement is 1500m [4921 feet = 0.93 mile];

(c) greater than 100m [328 feet], but does not exceed 150m [492 feet], the minimum distance requirement is 2000m [2km = 6562 feet = 1.24 miles];

(d) greater than 150m [492 feet], the minimum distance requirement is 3000m [3km = 9843 feet = 1.86 miles].

(5) The height of the wind turbine generator is measured from the ground to the end of the blade tip at its highest point.

(6) There is no minimum distance requirement if the height of the wind turbine generator does not exceed 25m [82 feet].

(7) If planning permission is granted on the condition that the proposed wind turbine generator meets the minimum distance requirement under subsection (5) the actual height of the wind turbine generator must not exceed the maximum height in relation to that minimum distance.

3.  Exception

(1) The local authority may grant planning permission for the construction of a wind turbine generator which does not meet the minimum distance requirement under section 2(4) if the condition under subsection (2) is met.

(2) The condition is that the owners of all residential premises which fall within the minimum distance requirement for the proposed wind turbine generator must agree in writing to the construction of the wind turbine generator.

(3) It is the duty of a relevant authority to ensure that no written agreement is elicited by unlawful means and that all necessary written agreements have been received before planning permission is granted.

4.  Short title and extent

(1) This Act shall be known as the Wind Turbines (Minimum Distances from Residential Premises) Act 2010.

(2) This Act extends to England and Wales.


Source:http://www.publications.parli…

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2024 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION