logo
Article

RCMP turbine idle again

Amherst Daily News|Darrell Cole|February 15, 2010
CanadaStructural Failure

For the third time since it went online, the wind turbine at the RCMP detachment in West Amherst is on the fritz. ...The turbine, which cost $225,000 to erect, broke down during a 2007 electrical storm and failed in 2008 after a fire in an electrical panel.


AMHERST - For the third time since it went online, the wind turbine at the RCMP detachment in West Amherst is on the fritz.

"We had another fire in the electrical panel and we've shut it down," Staff Sgt. Frank Kingston of the Cumberland RCMP said Friday. "It was the same panel in which we had a fire before. It was an electrical fire."

The cause of the fire is unknown.

The centerpiece of the new detachment when it opened in 2005, the 80-foot tall turbine was expected to save the RCMP about $13,000 annually in energy costs and reduce greenhouse gases by 150 tonnes of carbon dioxide.

Kingston said engineers were onsite last week to review the situation and he's awaiting their report. The turbine will not go back online the repairs …

... more [truncated due to possible copyright]

AMHERST - For the third time since it went online, the wind turbine at the RCMP detachment in West Amherst is on the fritz.

"We had another fire in the electrical panel and we've shut it down," Staff Sgt. Frank Kingston of the Cumberland RCMP said Friday. "It was the same panel in which we had a fire before. It was an electrical fire."

The cause of the fire is unknown.

The centerpiece of the new detachment when it opened in 2005, the 80-foot tall turbine was expected to save the RCMP about $13,000 annually in energy costs and reduce greenhouse gases by 150 tonnes of carbon dioxide.

Kingston said engineers were onsite last week to review the situation and he's awaiting their report. The turbine will not go back online the repairs are complete.

The turbine, which cost $225,000 to erect, broke down during a 2007 electrical storm and failed in 2008 after a fire in an electrical panel.


Source:http://www.amherstdaily.com/i…

Share this post
Follow Us
RSS:XMLAtomJSON
Donate
Donate
Stay Updated

We respect your privacy and never share your contact information. | LEGAL NOTICES

Contact Us

WindAction.org
Lisa Linowes, Executive Director
phone: 603.838.6588

Email contact

General Copyright Statement: Most of the sourced material posted to WindAction.org is posted according to the Fair Use doctrine of copyright law for non-commercial news reporting, education and discussion purposes. Some articles we only show excerpts, and provide links to the original published material. Any article will be removed by request from copyright owner, please send takedown requests to: info@windaction.org

© 2024 INDUSTRIAL WIND ACTION GROUP CORP. ALL RIGHTS RESERVED
WEBSITE GENEROUSLY DONATED BY PARKERHILL TECHNOLOGY CORPORATION