Video

Cohocton NY road damage (Part I)

This video shows road damage produced by overweight equipment on Cohocton, NY town roads. This is a UPC Wind project; Mortenson is the general contractor.

Part I:  duration 7 minutes 45 seconds

Part II: duration 8 minutes 23 seconds


Source: uAZLjvx-NI4

APR 12 2008
https://www.windaction.org/posts/14477-cohocton-ny-road-damage-part-i
back to top