Videos
Transporting turbine components
Produced December 22, 2007
(Posted April 26, 2008)
by Cautious1974
Description:
This short video shows the challenges of transporting a 40-meter wind turbine blade along roadways. The turbine component is headed to the Whitelee wind energy facility in the United Kingdom.
Duration: 2 minutes 19 seconds
| < prev | next > |
Note: this article may be subject to the Fair Use Notice.



