Videos filed under Structural Failure

Juniper Canyon wind turbine fire

The turbine on fire is part of the Iberdrola (now Avangrid) Juniper Canyon wind energy facility sited in Klickitat County, Washington. The project is owned and operated by Iberdrola Renewables (now Avangrid) and consists of 128 turbines (63 in Phase 1; 65 in Phase 2) for a total installed capacity of 251.2 MW. - dont like music
20 Jul 2019

Harvest II Wind Turbine Fire

A wind turbine off S Elkton caught fire. The turbine is part of the Harvest II wind energy facility placed in service in November 2012 by Exelon. The turbine is one of 33 Vestas V-100 (1.8 MW) turbines erected in Oliver, Chandler and McKinley townships in Huron County. 
1 Apr 2019

Windmill fire on the Langenhard

LAHR Germany -  Early Friday morning at 2.30 am police reported a turbine fire on the Langenhard near Lahr. At the same time, the Integrated Control Center Ortenau received the message that a wind turbine was burning on the Langenhard. The fire had already been seen on the way to the equipment house of the Seelbach Fire Department, said Operations Manager Bernd Wagner. This was his second wind turbine fire. The first was in 2013 - also on the Langenhard. Efforts to extinguish the fire remain highly dangerous because of the height of the turbine and the falling debris. Therefore, the fire department has cordoned off a radius of 500 meters, according to Wagner. A police helicopter was also requested to take survey photos and look for possible forest fires. The fire is over but the work is still ongoing. The fire department is preparing for a long operation.
8 Feb 2019

Wind turbine caught on fire in Arlington

A defective GE 2.5MW wind turbine erupted in flames at the Caithness Shepherds Flat wind energy facility causing fire to spread to more than a thousand acres of brush. The failed turbine was located at Rhea Road and Highway 19 just East of Arlington, Oregon in Gilliam County. The project was commissioned in 2012 and includes 338 turbines (845 MW) making it one of the largest in the United States. 
3 Aug 2018

Iowa: Nextera Wind Turbine Blaze

This 2.5 MW Clipper model C-96 turbine, part of NextEra's Endeavor I Wind Energy Center, burned for hours before this video was taken. The video shows the turbine's massive blade fall to the ground after first standing on its end before collapsing into a trail of black smoke and flames. The Endeavor I facility is located in Osceola County, Iowa. The turbines stand 420 feet tall including the 153-foot long blades; rotor diameter of 314-feet (96 meters). The 100 MW facility includes 40 turbines and was placed in service in 2008.  
9 Jun 2017

Turbine burn and collapse

This video was posted on Facebook and YouTube. Few details are provided about the incident including the location and timing of the event. (It is not clear the incident occurred in New Zealand.) Nonetheless, the video demonstrates the type of danger a turbine can pose when sited too close to where people may live or gather.
15 Jan 2016

http://www.windaction.org/posts?topic=Structural+Failure&type=Video
back to top