Videos filed under Safety

Harvest II Wind Turbine Fire

A wind turbine off S Elkton caught fire. The turbine is part of the Harvest II wind energy facility placed in service in November 2012 by Exelon. The turbine is one of 33 Vestas V-100 (1.8 MW) turbines erected in Oliver, Chandler and McKinley townships in Huron County. 
1 Apr 2019

Windmill fire on the Langenhard

LAHR Germany -  Early Friday morning at 2.30 am police reported a turbine fire on the Langenhard near Lahr. At the same time, the Integrated Control Center Ortenau received the message that a wind turbine was burning on the Langenhard. The fire had already been seen on the way to the equipment house of the Seelbach Fire Department, said Operations Manager Bernd Wagner. This was his second wind turbine fire. The first was in 2013 - also on the Langenhard. Efforts to extinguish the fire remain highly dangerous because of the height of the turbine and the falling debris. Therefore, the fire department has cordoned off a radius of 500 meters, according to Wagner. A police helicopter was also requested to take survey photos and look for possible forest fires. The fire is over but the work is still ongoing. The fire department is preparing for a long operation.
8 Feb 2019

Wind project construction ignites brush fires

CBC News has learned there were at least three construction-related fires at the Henvey Inlet Wind (HIW) project in the weeks leading up to Parry Sound 33, the massive wildfire that torched thousands of hectares of wilderness along the northeastern shore of Georgian Bay — a destructive path that started at the construction site on July 18.
5 Dec 2018

Wind turbine caught on fire in Arlington

A defective GE 2.5MW wind turbine erupted in flames at the Caithness Shepherds Flat wind energy facility causing fire to spread to more than a thousand acres of brush. The failed turbine was located at Rhea Road and Highway 19 just East of Arlington, Oregon in Gilliam County. The project was commissioned in 2012 and includes 338 turbines (845 MW) making it one of the largest in the United States. 
3 Aug 2018

Iowa: Nextera Wind Turbine Blaze

This 2.5 MW Clipper model C-96 turbine, part of NextEra's Endeavor I Wind Energy Center, burned for hours before this video was taken. The video shows the turbine's massive blade fall to the ground after first standing on its end before collapsing into a trail of black smoke and flames. The Endeavor I facility is located in Osceola County, Iowa. The turbines stand 420 feet tall including the 153-foot long blades; rotor diameter of 314-feet (96 meters). The 100 MW facility includes 40 turbines and was placed in service in 2008.  
9 Jun 2017

State of Mind: Wind farm encroachment

News of a possible wind farm development near a northwest Texas Air Force base has raised concerns about protecting military properties from outside development. Related legislation is poised to be a part of this legislative session. This is part of our "State of Mind" video series. The 15 military installations based in Texas prepare thousands of service members and generate more than 136-billion dollars in economic activity each year, according to the state comptroller. State lawmakers want to ensure nothing interferes with the bases’ missions.
13 Jan 2017

http://www.windaction.org/posts?topic=Safety&type=Video
back to top