Documents filed under General

Our undiversified wind portfolio

Wind advocates like to say "The wind's always blowing somewhere" to counter concerns about the variability of wind power. This is true, and it means that wind can always be relied on to produce some power, but that does not mean that wind can always meet demand. In the United States' Great Plains wind belt, wind is typically anticorrelated with demand.
30 Apr 2009

George Washington National Forest letter to Freedomworks

2009_0402_hyzer_freedomworks_denial_ltr_thumb Freedomworks submitted a proposal for erect three meteorological towers on North Mountain in the George Washington National Forest. The request was in in early December, however the company's plans were known for about one year ago. The forest supervisor, Maureen Hyzer denied the request in this April 2 letter. Reasons for the denial were that the request did not comply with the forest management plan and there was no rationale specified for why the use of national forest land was necessary. The complete memo can be downloaded by clicking on the link below.
2 Apr 2009

Cape Vincent’s unethical black hole

Wpeg_conflict_ad_1_thumb This open letter to representatives of British Petroleum and Acciona/AES appeared in New York's Watertown Daily Times newspaper in response to questionable business practices by the developers seeking to build wind facilities in Cape Vincent, New York. The full letter can be accessed by clicking on the link below.
15 Feb 2009

NY Supreme Court order re: Prattsburgh eminent domain suit

Prattsburghlawsuit_eminentdomain_thumb Memorandum and order issued by the NY State Supreme Court in the matter involving a request by property owners in Prattsburgh to annul the decision by the Town Board of the Town of Prattsburgh to condemn a portion of the petitioners' property in order to create certain easements for Windfarm Prattsburgh, LLC, to place underground electricity lines for a wind farm project.
6 Feb 2009

Wilderness Society and Center for Biological Diversity comment on Deerfield Wind DEIS

11-28-08_final_tws_cbd_deis_deerfield_wind_comments_wo_signs_thumb The Wilderness Society and the Center for Biological Diversity submitted these joint comments toe the U.S. Forest Service in response to the Draft Environmental Impact Statement (DEIS) for the Deerfield Wind Project. Click here to access the Forest Service DEIS. The comments submitted can be downloaded by clicking on the link at the bottom of this page.
28 Nov 2008

USFWS comments on DEIS prepared for Deerfield Wind proposal, Green Mountain National Forest

Deerfieldwind-doi_thumb Iberdrola has proposed a wind energy facility to be erected on national forest lands in the Green Mountain National Forest located in Vermont. The Forest Service released the draft environmental impact statement (DEIS) in September 2008. The full DEIS can be accessed at http://www.windaction.org/documents/17983. The US Fish and Wildlife Service submitted comments on the DEIS. These comments can be downloaded by clicking on the link at the bottom of this page.
25 Nov 2008

Capacity factor of wind power: Realized Values vs. Estimates

Capacityfactorofwind_thumb For two decades, the capacity factor of wind power measuring the mean energy delivered by wind turbines has been assumed at 35% of the name plate capacity. Yet, the mean realized value for Europe over the last five years is closer to 21% thus making levelized cost 66% higher than previously thought. We document this discrepancy and offer rationalizations, emphasizing the long term variations of wind speeds. We conclude with the consequences of the capacity factor miscalculation and some policy recommendations. Click on the link below to download the full document.
1 Oct 2008

ORDER RE VIOLATIONS OF EXISTING CPG

6784orderrecpgviolations_thumb The Vermont Public Service Board has issued an order regarding violation of a 2003 Certificate of Public Good issued to enXco authorizing construction of two wind measurement towers ("met towers") on Lowell Mountain. The CPG required that the towers be removed within five years of the date of the CPG. The order detailing the violation and subsequent agreements is listed below.
13 Aug 2008

Len Freeman testimony before Logan County Zoning Board

Zboapresentation_thumb The Logan County, IL zoning board of adjustment is conducting a public hearing on Horizon Wind's Rail Splitter wind facility. Mr. Len Freeman of Emden, IL presented this testimony before the Board. An excerpt of Mr. Freeman's testimony can be read below. His full testimony can be accessed by clicking on the link below.
19 Jun 2008

Report: Champaign County, OH wind turbine study group

Wtgsreport_thumb This report is a culmination of eight months of effort by the Champaign County (Ohio) Wind Turbine Study Group (“WTSG”). It contains the results of the research and critical analysis compiled by the group regarding fourteen readily identifiable issues associated with wind energy development. The letter introducing the report is listed below along with the report's table of contents. The full document can be downloaded by clicking on the link at the bottom of the page.
20 May 2008

UPC Wind underground line easement agreement

Upc_easement_thumb UPC Wind (First Wind) is seeking landowners in Prattsburgh, NY to negotiate this easement agreement to permit the company an exclusive and permanent right of way and easement to build, rebuild, relocate, operate, repair, maintain, renew and at their pleasure remove underground transmission lines for purposes of transmitting electricity, communications systems etc. The full agreement can be accessed by clicking on the link below.
21 Apr 2008

http://www.windaction.org/posts?p=5&topic=General&type=Document