Documents filed under Impact on Landscape

NLRA opposes Iberdrola windfarm in watershed of the lake

To NLRA Members and Stewards of the Newfound Lake Watershed, regarding the proposed Wild Meadows Wind Project: The NLRA has been paying close attention to the proposed Wild Meadows Wind project, and we are taking it very seriously. Several NLRA Trustees attended the first meeting of Newfound Wind Watch. During that meeting we stated that this topic would be thoroughly discussed at a planned upcoming Board meeting. Trustees and staff met with Wind Watch leadership in late October and reiterated our commitment. Staff and Trustees attended the Iberdrola presentation in Alexandria on November 14th to continue gathering information At our recent Board meeting, after careful consideration and deliberation, the NLRA Trustees unanimously approved the following position:
23 Nov 2012

Maine DEP order denying Passadumkeag wind park

Passadumkeag_denial_l25597anbn-2-_thumb The State of Maine Board of Environmental Protection denied the application of Passadumkeag WInd Park LLC to construct a 14-turbine, grid-scale, wind energy development. The denial was tied to the impact of the turbines on Scenic Resources of State or National Significance. An brief excerpt of the order is provided below. The full order can be accessed by clicking on the link at the bottom of this page.
9 Nov 2012

Renewable Energy on the National Forest Estate

Windcommunitiesguidance_fcs__wind_power_developers_thumb This report prepared by the Forest Commission Scotland (FCS) facilitates wind energy development on national forest land in the country. The report, obtained through a freedom of information act, shows how FCS divided the public land it manages into 5 'lots' to be prospected by specific wind energy developers. For example, ScottishPower Renewables were awarded Lot 1 and the right to develop schemes of less than 5MW in Lots 1-5. The remaining 4 lots are allocated to four other developers all of whom are currently working through the exclusivity period to identify suitable sites for wind turbines.
1 Jul 2012

Renewable Energy on the National Forest Estate

Windcommunitiesguidance_fcs__wind_power_developers_thumb This report prepared by the Forest Commission Scotland (FCS) facilitates wind energy development on national forest land in the country. The report, obtained through a freedom of information act, shows how FCS divided the public land it manages into 5 'lots' to be prospected by specific wind energy developers. For example, ScottishPower Renewables were awarded Lot 1 and the right to develop schemes of less than 5MW in Lots 1-5. The remaining 4 lots are allocated to four other developers all of whom are currently working through the exclusivity period to identify suitable sites for wind turbines.
1 Jul 2012

Denial of development permit for the Bowers Wind project

Cw_4889_denial_april_2012_final_thumb The Maine Land Use Regulatory Commission denied a permit for the 27-turbine (62.1 MW) Bowers Wind Energy facility proposed by Champlain Wind, LLC which is wholly owned by First Wind. The 27-page order denying the permit explains how the impact on scenic resources would be unreasonably adverse. An excerpt of the denial is provided below. The full document can be accessed at the links at the bottom of this page.
20 Apr 2012

Policy and planning guidelines for development of wind energy facilities in Victoria

52_32_thumb The Victoria Planning Provisions are undergoing amendments to account for wind energy development. Several key elements of the amendments are posted below. Three documents explaining the changes can be accessed by selecting the links at the bottom of this page. The changes prohibit the siting of turbines (a) within two kilometres of a existing dwellings unless written consent from the owner of the dwelling is provided, (b) in areas with high conservation and landscape values, and (c) locations that feature a high degree of amenity, environmental value, or are a significant tourist destination.
1 Aug 2011

Save The River Position on Industrial Wind Development within the St. Lawrence River Valley

Save_the_river_wind_moratorium_position_statement_080410_formatted_thumb The special nature of the place that we inhabit, including the importance of the habitat and flyway, when taken with the scale of the wind energy projects proposed, the lack of a process to assess cumulative review, and the initial indications of substantial impacts to birds and bats, all lead us to conclude that wind projects proposed for our area should not proceed further until the Wolfe Island Wind post-construction wildlife impact study is completed and a cumulative wildlife impact assessment involving the US and Canadian governments has occurred.
4 Aug 2010

Rejection of wind farm sought by Nor'Wester Mountain Escarpment Protection Committee

The below letter, written by the Nor'Wester Mountain Escarpment Protection Committee, requests the Ontario Ministers of Energy and Infrastructure and of the Environment to intervene and stop the approval of an industrial wind energy facility on the Nor'Wester Mountain Range and the Loch Lomond Watershed in the Thunder Bay Area.
3 May 2010

Rejection of wind farm sought by Nor'Wester Mountain Escarpment Protection Committee

The below letter, written by the Nor'Wester Mountain Escarpment Protection Committee, requests the Ontario Ministers of Energy and Infrastructure and of the Environment to intervene and stop the approval of an industrial wind energy facility on the Nor'Wester Mountain Range and the Loch Lomond Watershed in the Thunder Bay Area.
3 May 2010

Stormwater appeal final brief - Sheffield Wind

Sheffield-response-final_thumb Individual members of the grassroots group Ridge Protectors Inc., filed an appeal in Vermont's Environmental Court arguing that more ground would be disturbed by the Sheffield wind facility than was approved in the storm water discharge permit issued by the State's Agency of Natural Resources (ANR). The wind developer, First Wind has been approved by the Vermont Public Service Board to erect sixteen 2.5 megawatt wind turbines along a ridgeline in Sheffield, Vermont. The final brief filed by the Ridge Protector appellants can be accessed by clicking on the link at the bottom of this page. An excerpt of the brief is posted below.
4 Feb 2010

http://www.windaction.org/posts?p=2&topic=Impact+on+Landscape&type=Document
back to top