Videos from Washington

Fire sparked by a wind turbine

The turbine that sparked the fire was part of the Juniper Canyon facility located in Klickitat County in Washington State. The project, which is owned and operated by Iberdrola Renewables (now Avangrid), was constructed in two phases during the period from 2010 to 2012. It consists of 128 turbines (63 in Phase 1; 65 in Phase 2) and has a total installed capacity of 251.2 MW.
22 Jul 2019

Juniper Canyon wind turbine fire

The turbine on fire is part of the Iberdrola (now Avangrid) Juniper Canyon wind energy facility sited in Klickitat County, Washington. The project is owned and operated by Iberdrola Renewables (now Avangrid) and consists of 128 turbines (63 in Phase 1; 65 in Phase 2) for a total installed capacity of 251.2 MW. - dont like music
20 Jul 2019

http://www.windaction.org/posts?location=Washington&type=Video
back to top