Documents filed under Noise from Washington

Kittitas County Desert Claim Wind Power Project: Final EIS

Health___safety_thumb 3.8 Health & Safety Affected Environment, Environmental Impacts and Mitigation Measures "A number of comments submitted for the scoping process for the Desert Claim project EIS addressed concerns relating to potential health and safety issues. Specific topics indicated in these comments included certain possible hazards that are uniquely associated with wind turbines, such as blade throw and ice throw; health and safety issues associated with electrical and magnetic fields; more common hazards such as fire; and the incidence and impacts of shadow flicker, another phenomenon specific to wind turbines. Section 3.8 addresses these wide-ranging health and safety topics that have been identified as concerns for the environmental review. "
1 Jan 2004

David M. Lipscomb PhD testimony on noise and human health

Lipscomb-june2000_thumb Dr. David M. Lipscomb PhD provided this testimony before the State of Washington Energy Facility Site Evaluation Council involving the risks of noise emissions from then proposed Sumas Generating Plant on human health. An excerpt of the testimony is provided below. The full testimony can be downloaded by clicking on the link at the bottom of this page.
26 Jun 2000

http://www.windaction.org/posts?location=Washington&p=7&topic=Noise&type=Document
back to top