Documents filed under Noise from USA

Decision: Tuscola Wind III v Almer Township MI

Tuscola_iii_v_almer_township_order_thumb This important decision by US District Court Judge Thomas L. Ludington addresses two arguments proffered by the wind industry. The first relates to the industry's argument that noise standards for limiting turbine noise emissions that are based on Lmax are not reasonable. The second discusses the argument that restricitve ordinances, in this case an Lmax noise limit, are de facto exclusionay zoning. Judge Ludington takes both claims on and finds the wind company's arguments are without merit. A portion of the decision is provided below. The full decision can be downloaded from this page.
3 Nov 2017

Wind Turbine Syndrome: The Impact of Wind Farms on Suicide

Turbine_zou201710_thumb This new report examines how locations where industrial wind turbines were erected near residences experienced measurable upticks in suicide. The researcher identifies three indirect tests of the role of low-frequency noise exposure including those most vulnerable to the noise, prevailing wind direction and potental of greater noise impacts, and turbine noise resulting in sleep deficiency. The abstract and conclusion of the paper are provided below. The full report can be accessed by clicking the links on this page.
30 Oct 2017

Rand: Critique of Noise Impact Report for NextEra's Golden West Wind Energy Center

Rand_review_epsilon-4177-goldenwest-170321_thumb NextEra's Golden West Wind Energy Center sited in El Paso County, Colorado was required under the County permit to conduct a noise impact study after the project was placed in service in October 2015. Acoustician Robert Rand was asked by residents living near the turbines to review the noise impact study as prepared by NextEra consultant, Epsilon Associates. Mr. Rand's report, included here, identified several material errors with Epsilon's report and also found that the project appears to be operating outside the noise limits permitted by the County and the State. The Golden West Wind Energy Center consists 145 1.72-megawatt GE turbines for a total installed capacity of 249.4-megawatts Mr. Rand's executive summary is provided below. The full report can be accessed by clicking the document icon on this page. 
23 Mar 2017

Minnesota Public Utilities Commission examines turbine noise complaint

Bent_tree_commerce_to_mpuc_4-11-2016_thumb Phase I of the Bent Tree Wind Project began operation in January 2012. The project consists of 122 Vestas V82/1650 (1.65 MW, diameter 82 m) turbines for a total installed capacity of 201.3 megawatts. Noise complaints were filed by at least two landowners since September 2015. Staff for the Energy Environmental Review and Analysis (EERA)  unit of the MN Department of Commerce examined the complaints and believe the complaints are both Unresolved and Substantial. In this letter with supporting documentation, EERA staff recommended the MN Public Utilities Commission initiate the process for addressing the complaint. The letter to the PUC is provided below. The full letter with documentation can be accessed by clicking the links on this page.
10 Apr 2016

Professional Caution to Brown County Health Director Chua Xiong

Rand_to_evans_and_tibbetts_23feb16_631pm_thumb In this powerful letter to the Brown County, Wisconsin Health Board, acoustician Robert Rand explains his obligations under INCE Rules of Practice to notify the appropriate authorities if he believes his professional judgment pertaining to human health impacts has been overruled. In this instance, Mr. Rand is responding to a decision by the county's health officer, Chua Xiong, to rule against the work of the Health Board and find that there is insufficient evidence to show a relationship between wind turbines and health concerns. Mr, Rand was one of four acousticians who studied the noise issues at the Shirley Wind facility. The final report showed that all of those involved with the study, including acousticians who work largely for the wind industry, agreed they had found sufficient evidence to classify low-frequency noise and infrasound emanating from the turbines as a serious issue.
23 Feb 2016

Infrasound Measurements of Falmouth Wind Turbines Wind #1 and Wind #2

Nce-report-of-february-27-2015_thumb This important study conducted at a home situated within 1300 feet of the Falmouth MA wind turbines identified infrasonic sound pressure levels inside the residence. These results are similar to results from other international researchers with references given in the report. The executive summary and conclusions sections of the report are provided below. The full report can be accessed by clicking the link on this page.
27 Feb 2015

Vermont PSB Orders investigation into noise emissions at operating power plants

Vermontpsb-8167memo-scopingorder_thumb The Vermont Public Service Board held a prehearing conference on January 8, 2014 to discuss opening an investigation into the issue of appropriate sound standards applicable to facilities constructed pursuant to 30 V.S.A. §§ 248 and 219a. This inludes wind energy facilities. In this order the Board established a process for conducting the proceeding, as well as a proposed scope of issues to be examined through the investigation. A portion of the order is provided below. The full order can be accessed by clicking the link(s) on this page.
29 Jan 2014

Ted Hartke Testimony: We abandoned our home

Hartke_submittal-wind_farm_experience_5-28-13_thumb Ted Hartke, his wife Jessica and their two children, Phillip (age 9) and Sophia (age 6) have abandoned their home in Vermilion County, Illinois due to turbine noise. This testimony was delivered to the Boone County Illinois county commissioners on May 28, 2013 as the county considered a wind ordinance that would permit wind development. This testimony predates Mr. Hartke and his family leaving their home. A portion of his testimony is provided below. His full testimony can be accessed by clicking the link on this page.
20 Jan 2014

Wind Turbines: A different breed of noise?

Ehp.122-a20-adifferentbreedofnoise_thumb Nate Seltenrich, a science and the environment writer, explores wind turbine noise. In this report, he writes that "anecdotal evidence strongly suggests a connection between turbines and a constellation of symptoms including nausea, vertigo, blurred vision, unsteady movement, and difficulty reading, remembering, and thinking." An excerpt of his report is provided below. The full article can be accessed by clicking the links on this page.
23 Dec 2013

Wind Turbines: A different breed of noise?

Ehp.122-a20-adifferentbreedofnoise_thumb Nate Seltenrich, a science and the environment writer, explores wind turbine noise. In this report, he writes that "anecdotal evidence strongly suggests a connection between turbines and a constellation of symptoms including nausea, vertigo, blurred vision, unsteady movement, and difficulty reading, remembering, and thinking." An excerpt of his report is provided below. The full article can be accessed by clicking the links on this page.
23 Dec 2013

Court order granting injunction; Falmouth turbine operations limited due to noise

Falmouthzbapreliminaryinjunctiondecisionandorder_thumb Two weeks ago, in the injunction hearing in the Town of Falmouth vs. the Falmouth Zoning Board of Appeals case where the ZBA decided that the wind turbines were a nuisance to Neil Andersen, both parties presented a 7AM to 7PM agreement to the judge.  Falmouth Selectmen subsequently disregarded that agreement and continued to run the wind turbines 5AM to 9PM.  One selectboard member advocated running the turbines 24/7 in spite of the Court's request. Hearing this, Superior Court Justice Christopher Muse granted the injunction sought by nearby residents. The order is available by clicking the link on this page.
21 Nov 2013

Industrial wind turbines, human variability, and adverse health effects

Nissenbaum-v2_38e-final_thumb Dr. Michael Nissenbaum, who conducted extensive research into the effects of of audible wind turbine noise on sleep disturbance, has written a paper that explains his findings to other medical professionals who are unaware of the issue. The summary of his paper appears on this page. The complete document can be accessed by clicking on the link on this page.
5 Nov 2013

Illinois School Superintendent Letter: Turbine noise creating health problems for students

Super-mulvaneyletter_thumb This letter, which was read at the Vermilion county board meeting on Monday, October 8, 2013, was written by William C. Mulvaney, the Superintendent of Schools for Armstrong Township High School and Armstrong-Ellis CUD #61 in Illinois. The project is Invenergy's California Ridge with 134 turbines in Vermilion and Champaign counties.  The setback at the time of construction was 1000 feet from the foundation of a family home.  The setback was later changed to 1200 feet from the foundation.  Mr. Mulvaney served on a wind ordinance panel. His message about students and families suffering the impacts of turbine noise and flicker is important.  
8 Oct 2013

Direct Testimony of Paul D. Schomer re: Highland Wind proposal

Paulschomer-highlandtestimony072913_thumb In testimony provided before the Wisconsin Public Service Commission in reference to the Highland Wind Farm proposal (102.5 megawatts), acoustician Paul Schomer provides important perspective on why modern wind turbines installed today are creating a greater risk to nearby residents. Excerpts of his testimony are provided below. The full testimony can be accessed by clicking on the links at the bottom of this page.
29 Jul 2013

Noise Test Procedure for Industrial Wind Turbines

Alliance-iwt-noise-protocol-submission-massdep-july-2013_thumb This letter, submitted to the Massachusetts Department of Environmental Protection (MA DEP) details the appropriate methodology for surveying turbine noise post-construction. The procedure was developed under the guidance of acoustician, Richard James of E-coustics Solutions. The criteria for compliance is specific to the Massachusetts state law regarding noise and will differ from other jurisdictions. However, the procedure should be consistent for all noise surveys. The full report can be accessed by clicking on the link(s) at the bottom of the page.
17 Jul 2013

http://www.windaction.org/posts?location=USA&topic=Noise&type=Document
back to top