CTA summary of findings on preconstruction noise studies, Clayton Wind Farm Project

Tocci___cavanaugh_executive_summary_for_clayton_thumb Cavanaugh Tocci Associates (CTA) was hired by the Town of Clayton NY to review the noise analysis prepared by Iberdrola/PPM for the Clayton wind farm project. CTA's report was delivered to the town on February 15, 2008 but refused by the Town Board with objections that the report was too technical. CTA was asked to prepare an executive summary of their report. The executive summary of the report can be accessed by clicking on the link below. To date, the town has refused to release the full CTA report to the residents of Clayton or to the Planning Board.
25 Aug 2008

Stull vs. Gamesa Energy USA LLC and Allegheny Ridge Wind Farm, LLC

Stullvsgamesa_thumb Todd and Jill Stull filed a complaint for damages and injunctive relief against Gamesa and Allegheny Ridge Wind Farm LLC (Babcock and Brown) due to excessive noise, flicker and other nuisance that are causing irreparable harm to the Plaintiffs and robbing them of their enjoyment of their property. A portion of their filing is detailed below. The full filing can be downloaded from the link at the bottom of this page.
1 May 2008

Richard James testimony re: Rail Splitter wind energy facility

08-05-01_tazewell_testimony_of_richard_james_thumb Richard James is a noise control consultant and acoustical consultant with E-Coustic Solutions in Michigan. In his testimony before the Tazewell County Zoning Board of Appeals in IL, Mr. James addresses the noise study conducted by Horizon Wind for the Rail Splitter wind energy proposal. His testimony can be accessed in full by clicking on the link below and reading from page 22 of the .pdf file. Mr. James' testimony is informative and compelling.
1 May 2008

DeWayne Wilkie health assessment report

Wilkiedoctorreport_thumb Mr. DeWayne Wilkie of Jefferson County, NY was seen by a cardiologist in March 2008. Dr. Carroll Moody assessed Mr. Wilkie's health and from a cardiovascular standpoint, declared Mr. Wilkie 'stable'. Dr. Moody also includes information in the report on how wind turbine noise might affect the pace maker inserted in Mr. Wilkie's chest.
18 Mar 2008

DeWayne Wilkie health assessment report

Wilkiedoctorreport_thumb Mr. DeWayne Wilkie of Jefferson County, NY was seen by a cardiologist in March 2008. Dr. Carroll Moody assessed Mr. Wilkie's health and from a cardiovascular standpoint, declared Mr. Wilkie 'stable'. Dr. Moody also includes information in the report on how wind turbine noise might affect the pace maker inserted in Mr. Wilkie's chest.
18 Mar 2008

AEI Special Report: Wind energy noise impacts

This document authored by Acoustic Ecology Institute provides a comprehensive overview of noise issues pertaining to utility-scale wind energy development. This AEI Special Report will be continually updated, incorporating new research, more recent reports, and suggestions/comments from readers. Planned topics to be added over time include: effects of noise on wildlife and habitat, offshore wind energy, and the health effects of chronic noise exposure.
15 Mar 2008

Cavanaugh Tocci comments on noise analysis PPM Clayton Wind Farm

Claytonnoisereportfromtocciacoustic_thumb The Town of Clayton, in Jefferson County New York, has released comments issued by Cavanaugh Tocci Associates in regard to the preconstruction sound level study conducted by PPM Energy for the Clayton Wind Farm. CTA's comments can be accessed by clicking on the link at the bottom of this page. The first two pages of the file provide an executive summary of the comments delivered to the Town at the request of the Town Board.
15 Feb 2008

Trempealeau County: Wind generator and wind generating facility ordinance (WI)

Ord_-_wind_ordinance_11-28-07_thumb This ordinance was adopted by the Trempealeau County Board in a 10-6 vote (see: http://www.windaction.org/news/13246 ). The ordinance distinguishes between three types of wind turbines including hobbyist, personal, and commercial. Commercial turbines include a 1-mile setback from habitable structures. The ordinance provides a comprehensive section on noise level limits for the turbines including specific requirements pertaining to pre- and post- construction noise studies. The adopted ordinance which can be downloaded below was sent to IWA by the Trempealeau County Clerk Paul L. Syverson.
17 Dec 2007