Articles from Rhode Island

Dose of reality at PUC/EUTG meeting

“Restructuring doesn’t save anybody any money,” said Bell, who had come up with a bottom line of 17.73 cents per kwh post-restructuring, versus the current 18.03 cent per kwh fuel charge. Bell’s analysis was met with shock. Some in the audience believed they had been “lied to” regarding the savings on electric bills that would come with connection to the wind farm and cable. 
18 Oct 2015

Portsmouth wind turbine extension decision again delayed

Voters approved building the turbine with a $3 million bond issue in 2007. The windmill was built in 2009 but has been idle since 2012 due to a faulty gearbox supplied by a company that has since gone bankrupt. ...Addressing a question by council member David Gleason, Mr. Brusini said WED would not be willing to renegotiate the 15.5-cent rate because it wouldn’t be economically viable for the company, which is already picking up the town’s debt.
1 Oct 2015

Concerns over quality of wind farm’s construction; Welding questions join list of troubles compiled by CRMC

Construction of the Block Island Wind Farm is once again raising red flags and upsetting state officials. Last month, the Deepwater Wind project caused alarm after inspectors found equipment damage and a number of hazards that threatened worker safety. This month, attention shifted to the quality of construction — specifically welding procedures and construction practices by the builder, Weeks Marine of Cranford, N.J.
28 Sep 2015

R.I. businesses fear spike in energy costs

RIMA’s objection to the Deepwater Wind project is the pricing mechanism that is in place and how that was established. The overall cost for electricity generated by Deepwater Wind is about four to five times that of natural gas and other renewable sources ...The excess, above-market cost to ratepayers will be about $497 million over 20 years (not including investment tax credits, the cost for the oversize cable, and other direct projects costs).
1 Sep 2015

Construction begins on Block Island wind farm but debate continues

“The opposition participated at every opportunity that was available, but the public process was a charade,” Rosemarie Ives said. “Every aspect of the state dealing with this project has been corrupted.” Less than a half mile to the east of the Ives’ home sits Southeast Light, one of the most popular destinations on the island. Now, visitors to the historic brick lighthouse get a clear view of the wind farm under construction from the front lawn.
23 Aug 2015

Distance from land to wind turbines clarified

Biwf_turbinetoshore_distances_thumb The following interview was conducted, written and edited by Lars Trodson on Tuesday, Aug. 11. It was learned later that day that the one steel jacket foundation placed in the water so far, which was subsequently damaged when it was hit by a barge, was taken out of the water. The Block Island Times sent in a series of six questions to Deepwater Wind regarding the condition, repair and current location of the foundation, and received the following response: 
14 Aug 2015

Barge accident dents Deepwater wind farm foundation

First, it was the weather. Rough seas forced the Providence company to push back until last Sunday the installation of the first steel foundation for the five-turbine wind farm off Block Island. Now, Deepwater is dealing with a construction mishap. Earlier this week, one of the barges being used in the project hit the latticework “jacket” foundation that had been placed in the water and dented one of its four hollow, tubular legs.
31 Jul 2015

http://www.windaction.org/posts?location=Rhode+Island&p=4&type=Article
back to top