Pictures filed under Structural Failure from Pennsylvania

Bear Creek wind turbine fire

Bearcreek-turbine-fire1_thumb A catastrophic fire destroyed one of the twelve Gamesa 2.0 MW wind turbines operating at the Bear Creek Wind Power Project. The facility, which is owned by Iberdrola, is located in Bear Creek Township near Wilkes-Barre in Luzerne County, Pennsylvania and was placed in service in 2006.
10 Nov 2016

Iberdrola owned Locust Ridge wind turbine fire

Windmillfirepetewalinchusschuylkillcountyfirewire_thumb Iberdrola's Locust Ridge wind energy facility experienced a catestrophic turbine fire. The project, located in Mahanoy City in Schuylkill County, Pennsylvania, was constructed in two phases and totals 64 Gamesa 2 MW turbines across more than 10 miles of ridgeline. Phase I (13 turbines) was completed in 2006. Phase II (51 turbines) was placed in-service in 2009. The turbine was permitted to burn itself out.
15 Mar 2014
back to top