Documents filed under Impact on Wildlife from New York

Save The River Position on Industrial Wind Development within the St. Lawrence River Valley

Save_the_river_wind_moratorium_position_statement_080410_formatted_thumb The special nature of the place that we inhabit, including the importance of the habitat and flyway, when taken with the scale of the wind energy projects proposed, the lack of a process to assess cumulative review, and the initial indications of substantial impacts to birds and bats, all lead us to conclude that wind projects proposed for our area should not proceed further until the Wolfe Island Wind post-construction wildlife impact study is completed and a cumulative wildlife impact assessment involving the US and Canadian governments has occurred.
4 Aug 2010

Guidelines for conducting bird and bat studies at commerical wind energy projects

Windguidelines_thumb These guidelines, prepared by the New York State Department of Environmental Conservation and Division of Fish, Wildlife and Marine Resources, set forth recommendations to commercial wind energy developers on how to characterize bird and bat resources at on-shore wind energy sites, and how to estimate and document impacts resulting from the construction and operation of wind energy projects. By issuing these guidelines, DEC intends to provide a consistent and predictable methodology for developers to assist them in the planning and development process.
21 Jan 2009

Maple Ridge Wind Power Avian and Bat Fatality Study Year One Report FINAL REPORT

Mapleridgereportfall2006final_thumb The following report describes the research design, initiation and completion of the first year of postconstruction study (fall migration only) of avian and bat collision fatalities at the 120 turbine Maple Ridge Wind Power Project in Lewis County, New York. The work was conducted in accordance with the “Proposed Scope of Work for a Postconstruction Avian and Bat Fatality Study at the Maple Ridge Wind Power Project, Lewis County, New York” dated March 14, 2006, and agreed upon in mid-May 2006, after several revisions. People/agencies who reviewed the proposed scope of work included staffers from the U. S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (ACE), Environmental Design and Research (EDR), NYS DEC staffers, developers (PPM and Horizon), and others. Representatives from some or all of these groups have been included in a Technical Advisory Committee (TAC), which has the responsibility of reviewing and commenting on progress reports, annual reports, and other updates from this project.
25 Jun 2007

NY DEC comments on DGEIS for Horse Creek wind power project

Nysdec_ppmjefferson_thumb The New York State Department of Environmental Conservation (DEC) reviewed the Draft Generic Environmental Impact Statement (DGEIS) for PPM's Horse Creek wind facility proposed for the New York towns of Clayton and Orleans, Jefferson County. The project consists of approximately 62 wind turbines (130 MW) with 54 turbines in the Town of Clayton and 8 turbines in the Town of Orleans. The project scope also includes construction of two permanent meteorological (met) towers, an operations and maintenance facility, approximately 16 miles of gravel access roads and approximately 28 miles of buried electric collection lines, and an interconnection substation adjacent to the existing electric transmission line.
15 Jun 2007

The Wayward Wind

Silver_lake_speech_thumb Because time seems to be running out on fossil fuels and the lure of non-polluting windpower is so seductive, some people are now promoting windpower initiatives at any cost, without investigating potential negative consequences-- and with no apparent knowledge of even recent environmental history......Throughout my experience, I could not substantiate a single claim developers made for industrial wind energy, including the one justifying its existence: that massive wind installations would meaningfully reduce our reliance on fossil fuels. When you understand this, you realize the wind business is not really that complex. But there are a lot of complicated issues swirling around it that obscure and distract from this main point, issues such as global warming, property values, the nature of wind leases, local revenues and taxes, wildlife, natural views, and a host of others. So how does one know the truth of it all? How does one go about separating the reality from spin?
19 Jun 2006

U.S. Fish & Wildlife Service to the Town of Prattsburgh (NY)

Us_fish_and_wild_1_._ecogendeiscomments_thumb The Steuben County Industrial Development Agency (IDA), as lead agency in the State Environmental Quality Review Act (SEQRA) process, is considering potential impacts from construction of 53 wind energy turbines which would generate approximately 79 megawatts of power. Turbine structures are anticipated to be approximately 389 feet tall from the ground to the highest blade tip. Structures such as a substation, 4.8 miles of buried cable, an unspecified amount of overhead transmission lines, and 3.4 miles of access roads must also be built in the 33,000 acre project area. This project is situated at the southern end of the Finger Lakes, near the New York State Department of Environmental Conservation (NYSDEC) Hi Tor Wildlife Management Area, the Hi Tor Bird Conservation Area, and generally along a north-south oriented ridge.
28 Nov 2005

Final Generic Environmental Impact Statement Ecogen, LLC Prattsburgh/Italy Wind Farm (NY)

Fgeis_rev1_thumb This Final Generic Environmental Impact Statement (FGEIS) has been prepared for the Ecogen, LLC (Ecogen) Prattsburgh/Italy Wind Farm Project (Project) on the behalf of the Lead Agency, the Steuben County Industrial Development Agency (SCIDA). The FGEIS is prepared pursuant to the New York State Environmental Quality Review Act (SEQR), Environmental Conservation Law, Article 8, 6NYCRR Part 617, and its implementing regulations.
22 Nov 2005

United State Fish and Wildlife Service Reviews Chautauqua Windpower's Avian Risk Assessment

Usfws_response_summary_thumb The United States Fish and Wildlife Service (USFWS) sent two letters October 12, 2005 to David Perry, Executive Vice President of Chautauqua Windpower LLC, severely critical of the draft Avian Risk Assessment (ARA) completed by Chautauqua Windpower and its consultants for the proposed wind power development in the Towns of Ripley and Westfield, Chautauqua County, New York. The shorter of the two letters focuses on the ARA’s attention to migrating and resident American Bald Eagles; the longer of the two letters consists of a broader evaluation of the ARA and its attention to all resident and migrating birds. The pdf file below is a brief summary of the USFWS letters criticizing the risk assessment. The full text of the two USFWS letters is available via the link below.
12 Oct 2005

NYS Dept. of Environmental Conservation letter to the City of Lackawanna re. Environmental Contamination and Birds/Bats

Seqrresp9-2-05_thumb September 2, 2005 City of Lackawanna Planning and Development Board Room 311, City Hall 714 Ridge Road Lackawanna, NY 14218 Attn: Joseph G. Geyer Re: Steel Winds Wind Farm Route 5, Former Bethlehem Steels works Lackawanna, NY Dear Mr. Geyer; The New York Sate Department of Environmental Conservation (DEC) staff have performed an initial review of the information and material provided with the City of Lackawanna’s SEQR Notice of Coordinated Review and Declaration of Intent to Act as Lead agency. These materials include the Application for Site Plan Approval and Certain Area variances to Authorize Construction and Operation of a Wind Energy Facility on a Portion of the Former Bethlehem Steel Works Site in Lackawanna, New York (the Application), and the Analysis of Environmental Impacts pursuant to SEQR (The EA). Please be advised the DEC does not object to the City of Lackawanna assuming the role of lead agency, but the DEC does reserve the right to comment on this action if a positive determination is made. As indicated in the following text of this letter, DEC staff have concerns for the potential impacts of certain aspects of this project. Our comments and concerns are listed below under the appropriate topic.
2 Sep 2005

Letter to Steuben County (NY) re. Draft Generic Environmental Impact Statement by Ecogen, LLC for Prattsburgh/Italy Wind Farm

Bbbo-ecogenresponse_thumb I am writing on behalf of the Board of Directors for the Braddock Bay Bird Observatory concerning the recent EIS issued for the Prattsburgh/Italy Wind Farm.....All BBBO Board members are trained ornithologists with extensive knowledge about local breeding and migratory birds. In addition, the Board has considerable expertise in methodologies and techniques used to assess and census breeding and migratory bird use of the local landscape (e.g. radar, breeding and migratory bird surveys, bird banding, population demographic, etc).... BBBO’s Board of Directors was surprised and shocked to see our organization’s data used in Ecogen’s EIS. We were not informed or consulted about the use of our data and, furthermore, we were not sent a copy of the draft EIS to review.
16 Jun 2005

http://www.windaction.org/posts?location=New+York&topic=Impact+on+Wildlife&type=Document
back to top