Analysis of New Hampshire RPS for Class I renewables

2013-05-13_testimony_of_lisa_linowes-final_thumb This testimony, prepared by Lisa Linowes, examines the Class I RPS market in the State of New Hampshire. Aggressive policies in the New England region have resulted in New Hampshire RECs migrating to other states. This testimony was submitted in reference to the Timbertop wind energy proposal, a 15 megawatt project proposed to be built in the state. A portion of the testimony is shown below. The full testimony can be accessed by clicking the links on this page.
13 May 2013

MA DPU Chairman memo and comments to the ISO New England

Hibbard_draft_eswg_comments_july_18_2008_thumb Memo from the Massachusetts Department of Public Utilities Chairman, Paul Hibbard, to the ISO New England. Chairman Hibbard expresses his concerns over the push to regionalize costs for building expensive transmission lines to service renewable projects (wind) built far from load centers. Current FERC rules are unclear on how to justify distribution of the costs across all ratepayers within the region unless it can be shown such transmission is needed to ensure the reliability and integrity of the grid.
11 Jun 2008

Lempster Mountain Wind Power Project: Direct Pre-filed Testimony of Lisa Linowes

Linowes_prefiled_testimony_070207and_cover_thumb Why did you petition to become an intervenor in this matter before the NH SEC? With New Hampshire’s recent reinstatement of PILOT agreements and legislative efforts to a Renewable Portfolio Standard, the regulatory groundwork is being laid for more wind facilities to enter the state. Yet, New Hampshire, like many states, has no consistent regulatory process in place for reviewing these projects to ensure our environmental, societal, and economic interests are protected. The work the NH SEC has agreed to undertake in reviewing this application is precedent setting. How the committee approaches its review and the weight it places on arguments presented by all sides will impact other developments in the State as pertains to renewable energy projects. There are a multitude of conflicting issues at play when considering any wind project. My commitment to this process is to help provide, to the best of my ability, valuable and timely information that will assist the Committee in making an informed decision on this application.
7 Feb 2007

The Challenge of Energy Policy in New England

Rr0602_thumb Renewable energy sources have disadvantages as well as advantages, however. Although their costs have decreased in recent years, many renewables are still more costly than traditional sources. Some are also available only intermittently; for example, wind can be variable and hydroelectric is seasonal. And while many people are in favor of renewables in principle, many are also unhappy when faced with the prospect of a windmill or a trash-burning power plant in their neighborhood. These facilities face the same siting and investment difficulties that any electrical facility would, as the developers of a proposed wind farm off the coast of Cape Cod have discovered in recent years.
1 Apr 2006

Draft 2004 New England Marginal Emission Rate Analysis

Marginalemissionrateanalysis_thumb ...the MEA Report can be used to estimate the value (avoided emissions) of Renewable Energy Certificates (REC) by providing both REC suppliers and stakeholders with information that can be used to communicate the environmental benefits of RECs and works to enhance the overall REC marketplace. Editor's Note: As noted below under Methodology [emphasis added], this report appears to substantiate the point that wind energy would not backdown "baseload" generation.
28 Feb 2006

ISO-NE Load Forecast Methodology

This presentation indicates that for New England the increasing demand for summer-time electricity is greater and increasing faster than winter-time demand. The fast-rising need for power in summer will likely result in construction of new power plants to keep ahead of demand - although inland industrial wind plants will not be able to contribute much to this demand period due to their very low capacity factor during summer months.