Pictures filed under General from Massachusetts

Blade failure in Michigan

04236_wind2_thumb DTE Energy found a part of a blade had fallen off one of its turbines located at the Thumb wind facility in Michigan. The Thumb wind facility went into commercial operation in December 2012. The project consists of 110-megawatt (MW) (69 1.6-megawatt GE wind turbines).
11 Mar 2013

Simulation: Eastham MA.

Turbine623_thumb This photo shows a representation of how 196.85-foot-tall wind turbines might appear at the former Tilcon site on Nauset Road in North Eastham. The proposed turbines for this site would be close to 400 feet tall.
23 Jun 2006

http://www.windaction.org/posts?location=Massachusetts&topic=General&type=Picture
back to top