Library filed under Energy Policy from Massachusetts

ISO-NE Load Forecast Methodology

This presentation indicates that for New England the increasing demand for summer-time electricity is greater and increasing faster than winter-time demand. The fast-rising need for power in summer will likely result in construction of new power plants to keep ahead of demand - although inland industrial wind plants will not be able to contribute much to this demand period due to their very low capacity factor during summer months.
19 Dec 2003

Green Power and Energy Efficiency Opportunities for Municipalities in Massachusetts

Synapse_energy_thumb The purpose of this report is to identify and characterize the range of options available to municipalities for purchasing green power and improving the efficiency with which electricity is consumed. Municipalities have several viable options for purchasing electricity in a fashion that is consistent with the energy, cost, and environmental goals of the community. Municipalities are in a better position to achieve certain policy goals than are individual customers through their collective buying power. A municipality’s advantage lies in the size of its electricity load, in the potential for more sophisticated decision-making than individual customers can apply, and in the potential for reflecting more of the public interest in the decision-making process.
22 May 2002

http://www.windaction.org/posts?location=Massachusetts&p=178&topic=Energy+Policy
back to top