Mars Hill windfarm post-development sound level study peer review

Mars_hill_windfarm_post-development_reviewed_thumb In response to complaints of noise at the Mars Hill (ME) wind facility, the Maine Department of Environmental Protection (MEDEP) contracted EnRad Consulting to peer-review the pre- and post- sound studies performed by the developer, Evergreen/UPC Wind. EnRad's report to the MEDEP can be accessed below. The stated objective of this sound level study was to compare wind farm operation sound levels with predicted estimates and evaluation of the ambient sound levels in the vicinity of the wind farm. The developer, UPC Wind, initiated an ambient and operations sound level study late in 2006 after receiving concerns from persons residing in nearby protected locations. The "Recommendations" section of the EnRad Consulting report is published below. The full report can be downloaded by clicking on the link at the bottom of the page.
21 Nov 2007

Mars Hill wind project sound level study

Upc_letter_to_medep_filing_rse_re_sound_06_21_07_thumb In response to noise complaints at the Mars Hill wind facility, the Maine Department of Environmental Protection (DEP) requested developer UPC Wind Management LLC conduct a sound level study at the site. Here is the cover letter and document ("Sound Level Study - Ambient & Operations Sound Level Monitoring") submitted by UPC to the Maine DEP.
21 Jun 2007

Lempster Wind, LLC- NH docket 2006-01: public comment

Lempster_cm_070604_thumb These public comments were filed with the New Hampshire Site Evaluation Committee in reference to the Lempster Wind proposal (NH SEC Docket 2006-01 - Lempster, NH). Ms. Martin's comments were prepared following interviews she had with residents living near the Mars Hill, Maine commerical wind project. The Mars Hill wind project went on line in early 2007; problems of noise were reported as early as December 2006.
4 Jun 2007

Wendy Todd testimony before Maine legislature

Wendytoddtestimony07-04-30_thumb The following testimony was given on April 30, 2007 to the Maine legislature by Wendy Todd of Aroostook County, Maine. Ms. Todd lives near the Mars Hill wind "farm,” which went on-line in the winter of 2007. An excerpt of her testimony is included below. The full testimony can be downloaded by clicking on the link.
30 Apr 2007