Library from Illinois

Wind farm tower permits move to county board

The Knox County Board’s Assessor and Zoning Committee voted during its meeting to forward conditional use permits for two temporary meteorological towers for the wind farm to the full Knox County Board. ...Oakland-based Orion Renewable Energy aims to bring the 300-megawatt wind farm to the county. 
18 Jul 2018

Flicker, noise rules added to DeKalb County wind ordinance draft

The DeKalb County Planning and Zoning Committee passed several more elements of the ordinance draft during its special meeting. Those new components passed require no radio frequency and electromagnetic field interference as a result of wind turbines, a zero-tolerance policy for shadow flicker and flash, and sound level regulations including a maximum allowable level of 30 decibels from 10 p.m. to 7 a.m. and 35 decibels from 7 a.m. to 10 p.m.
12 Jul 2018

Wind farm hits a big road block

Plans for a wind farm ran into a big problem Monday night after the township voted to ...set stricter rules for wind farms. Tuesday night, township residents voted 86 yes - 57 no to creating a zoning ordinance which would create new rules for their land. 
11 Jul 2018

DeKalb County Planning and Zoning Committee will evaluate wind turbine setback standards next

DeKalb County Board Chairman Mark Pietrowski Jr. said the moratorium to come up with a wind farm ordinance still is in effect through September. That comes after the County Board approved a solar farm ordinance that went into effect last month. Pietrowski said the board is still in the research process for the wind farm ordinance, and there is no draft of the ordinance yet.
22 May 2018

http://www.windaction.org/posts?location=Illinois&p=2
back to top