Documents filed under Zoning/Planning from Europe

Turbine denied (Joicey V Northumberland County Council)

Joiceyr_v_northumberland_county_council_2014_ewhc_3657_thumb In this case, the claimant, Andrew Joicey, argued six grounds for overturning the planning approval of a 100kilowatt wind turbine. Primary among the complaints was that the planning council did not provide public access to the turbine noise assessment report until a day before the hearing where approval was granted. Complaints were also issued over whether the council properly considered the cumulative impact of noise from a neighboring wind project. The count agreed with Mr. Joicey and overturned the approval. This is the third time the court overturned a planning decision approving this turbine. The decision can be accessed by clicking the links on this page. The introduction of the decision is provided below. 
11 Nov 2014

Less For More: The Rube Goldberg Nature of Industrial Wind Development

Less_for_more_thumb Rube Goldberg would admire the utter purity of the pretensions of wind technology in pursuit of a safer modern world, claiming to be saving the environment while wreaking havoc upon it. But even he might be astonished by the spin of wind industry spokesmen. Consider the comments made by the American Wind Industry Association.s Christina Real de Azua in the wake of the virtual nonperformance of California.s more than 13,000 wind turbines in mitigating the electricity crisis precipitated by last July.s .heat storm.. .You really don.t count on wind energy as capacity,. she said. .It is different from other technologies because it can.t be dispatched.. (84) The press reported her comments solemnly without question, without even a risible chortle. Because they perceive time to be running out on fossil fuels, and the lure of non-polluting wind power is so seductive, otherwise sensible people are promoting it at any cost, without investigating potential negative consequences-- and with no apparent knowledge of even recent environmental history or grid operations. Eventually, the pedal of wishful thinking and political demagoguery will meet the renitent metal of reality in the form of the Second Law of Thermodynamics (85) and public resistance, as it has in Denmark and Germany. Ironically, support for industrial wind energy because of a desire for reductions in fossil-fueled power and their polluting emissions leads ineluctably to nuclear power, particularly under pressure of relentlessly increasing demand for reliable electricity. Environmentalists who demand dependable power generation at minimum environmental risk should take care about what they wish for, more aware that, with Rube Goldberg machines, the desired outcome is unlikely to be achieved. Subsidies given to industrial wind technology divert resources that could otherwise support effective measures, while uninformed rhetoric on its behalf distracts from the discourse.and political action-- necessary for achieving more enlightened policy.
20 Dec 2006

Less For More: The Rube Goldberg Nature of Industrial Wind Development

Less_for_more_thumb Rube Goldberg would admire the utter purity of the pretensions of wind technology in pursuit of a safer modern world, claiming to be saving the environment while wreaking havoc upon it. But even he might be astonished by the spin of wind industry spokesmen. Consider the comments made by the American Wind Industry Association.s Christina Real de Azua in the wake of the virtual nonperformance of California.s more than 13,000 wind turbines in mitigating the electricity crisis precipitated by last July.s .heat storm.. .You really don.t count on wind energy as capacity,. she said. .It is different from other technologies because it can.t be dispatched.. (84) The press reported her comments solemnly without question, without even a risible chortle. Because they perceive time to be running out on fossil fuels, and the lure of non-polluting wind power is so seductive, otherwise sensible people are promoting it at any cost, without investigating potential negative consequences-- and with no apparent knowledge of even recent environmental history or grid operations. Eventually, the pedal of wishful thinking and political demagoguery will meet the renitent metal of reality in the form of the Second Law of Thermodynamics (85) and public resistance, as it has in Denmark and Germany. Ironically, support for industrial wind energy because of a desire for reductions in fossil-fueled power and their polluting emissions leads ineluctably to nuclear power, particularly under pressure of relentlessly increasing demand for reliable electricity. Environmentalists who demand dependable power generation at minimum environmental risk should take care about what they wish for, more aware that, with Rube Goldberg machines, the desired outcome is unlikely to be achieved. Subsidies given to industrial wind technology divert resources that could otherwise support effective measures, while uninformed rhetoric on its behalf distracts from the discourse.and political action-- necessary for achieving more enlightened policy.
20 Dec 2006

Mynydd-y-Gwrhyd Planning Inspector's Report

Gwrhyd_appeal_thumb This is the report submitted by the Planning Inspector appointed by the National Assembly for Wales that dismisses the appeal by the Awe Amman Tawe quango for a wind farm on Mynydd-y-Gwrhyd. Of particular interest are the Inspector's remarks on Landscape and Visual Impact (paragraphs 16-20 on pages 5-6) with respect to how 'developers photomontages' do not give the true visual impact of actual wind farm sites.
28 Sep 2006

Appeal Decision - Edder Acres Farm, Shotten Colliery

Appeal_decision_thumb A7 Energy's appeal against the Easington District Council for refusing to grant planning permission with respect to a wind plant consisting of 2 x 2.3MW turbines was dismissed by D. L. Burrows, an inspector appointed by the Secretary of State for Communities and Local Government. The principal reason for dismissal was adverse impact the turbines would have on the activities of Shotten airfield.
2 Jun 2006

The Dutch Wind Energy Planning Process

The_dutch_wind_energy__planning_process_thumb The Poldermodel approach is consensus-based. The poldermodel is a model on which Dutch society and politics are based. The Poldermodel ensures that different planning systems are used for every ministry. There is a need to draw all planning systems together into one system. This is done by means of communication and negotiation. The Poldermodel intends to involve as many (relevant) stakeholders as possible to give every person the possibility to plan developments on the scarce land.
28 Mar 2006

Whinash Decision Documents

Whinashwindfarm_thumb The Secretary of State accepts the Inspector’s [David M H Rose] findings on the section 36 application. He agrees with the Inspector’s conclusions that the Whinash site is an important and integral part of a far reaching landscape which is highly sensitive to change and that the adverse environmental impacts of the Development would conflict with the aims of Planning Policy Statement 22 which is, in part, to minimise the impacts of wind generation and to achieve environmental safeguards. He also agrees with the Inspector’s conclusion that the environmental harm to this particular landscape outweighs the benefits of securing renewable energy at the Whinash site. The Secretary of State therefore accepts, taking account of the further comments below, the Inspector’s recommendation that consent be refused. Editor's Note: The pdf file contains the complete report.
2 Mar 2006

UK Energy Policy: The Small Business Perspective & The Impact on the Rural Economy

Sbcenergyreport_thumb This report surveys the intense debate now taking place as to why the chosen strategy is not achieving its objectives. We believe that a principal factor is to be found in the increasingly controversial renewable energy policy, which is widely criticised for its lack of balance and its over-emphasis on onshore wind at the expense of other technologies.
1 Feb 2006

Working Paper: Utility-scale Wind Power: Impacts of Increased Penetration

Dti3_20robin_20oakley_20atl_1__thumb This working paper is made available by the Resource and Environmental economics and Policy Analysis (REPA) Research Group at the University of Victoria. REPA working papers have not been peer reviewed and contain preliminary research findings. They shall not be cited without the expressed written consent of the author(s). Editor's Note: The authors’ conclusion regarding ‘effective capacity’, i.e. the measure of a generator’s contribution to system reliability that is tied to meeting peak loads, is that it “is difficult to generalize, as it is a highly site-specific quantity determined by the correlation between wind resource and load” and that ‘values range from 26 % to 0% of rated capacity.” This conclusion is based, in part, on a 2003 study by the California Energy Commission that estimated that three wind farm aggregates- Altamont, San Gorgonio and Tehachpi, which collectively represent 75% of California’s deployed wind capacity- had relative capacity credits of 26.0%, 23.9% and 22.0% respectively. It is noteworthy that during California’s Summer ’06 energy crunch, as has been widely publicized in the press, wind power produced at 254.6 MW (10.2% of wind’s rated capacity of 2,500MW) at the time of peak demand (on July 24th) and over the preceding seven days (July 17-23) produced at 89.4 to 113.0 MW, averaging only 99.1 MW at the time of peak demand or just 4% of rated capacity.
1 Jun 2005

Working Paper: Utility-scale Wind Power: Impacts of Increased Penetration

Dti3_20robin_20oakley_20atl_1__thumb This working paper is made available by the Resource and Environmental economics and Policy Analysis (REPA) Research Group at the University of Victoria. REPA working papers have not been peer reviewed and contain preliminary research findings. They shall not be cited without the expressed written consent of the author(s). Editor's Note: The authors’ conclusion regarding ‘effective capacity’, i.e. the measure of a generator’s contribution to system reliability that is tied to meeting peak loads, is that it “is difficult to generalize, as it is a highly site-specific quantity determined by the correlation between wind resource and load” and that ‘values range from 26 % to 0% of rated capacity.” This conclusion is based, in part, on a 2003 study by the California Energy Commission that estimated that three wind farm aggregates- Altamont, San Gorgonio and Tehachpi, which collectively represent 75% of California’s deployed wind capacity- had relative capacity credits of 26.0%, 23.9% and 22.0% respectively. It is noteworthy that during California’s Summer ’06 energy crunch, as has been widely publicized in the press, wind power produced at 254.6 MW (10.2% of wind’s rated capacity of 2,500MW) at the time of peak demand (on July 24th) and over the preceding seven days (July 17-23) produced at 89.4 to 113.0 MW, averaging only 99.1 MW at the time of peak demand or just 4% of rated capacity.
1 Jun 2005

Impact of a large-scale offshore wind farm on meteorology: Numerical simulations with a mesoscale circulation model

Impact_of_large_scale_off_shore_windplants_on_meterology_thumb In this thesis the meteorological effects of a large-scale (9000 km2) offshore wind farm in the North Sea were simulated using the MM5 mesoscale model. The wind farm was simulated by introducing a higher roughness length (0.5 m) in the area of the wind farm. The meteorological effects were examined by comparing model runs with and without wind farm. Turbulent kinetic energy, cloud formation, precipitation and wind speed reduction were studied. Two case studies with westerly flows were performed. The first case study begins at 00 UTC July 1st 2001 and ends at 18 UTC July 3rd 2001. The second is from 00 UTC October 2nd 1999 to 18 UTC October 4th 1999.
2 Jan 2004

http://www.windaction.org/posts?location=Europe&topic=Zoning%2FPlanning&type=Document