Documents filed under Impact on Landscape from California

Campo Wind Complaint

Campo_wind_complaint_7-8-20_thumb This complaint in federal court challenges the United States Bureau of Indian Affairs (“BIA”) notice of record of decision (ROD) authorizing the issuance of a 25-year lease of land (with a possible 13-year extension) between the Campo Band of Diegueño Mission Indians and Terra-Gen Development Company LLC (“Terra-Gen”), allowing Terra-Gen to develop, construct, the Campo Wind Facilities on the Reservation, and the Boulder Brush Facilities on adjacent private lands. The Campo Wind Facilities would consist of sixty 586-foot tall turbines, three 374-foot meteorological towers, 15 miles of new access roads, an electrical connection and communication system, a collector substation, an operation and maintenance facility, a gen-tie line, and other components needed for construction and operation. A portion of the complaint is provided below. The full complaint can be downloaded from the document links on this page. 
8 Jul 2020

Iberdrola - Tule Wind construction suspension order

Blm-tulewind-tempconstructionsuspension_thumb The attached communications between the Bureau of Land Management (BLM) and Iberdrola/Tule Wind detail the BLM's notice to suspend construction of the 186 MW wind project due to repeated violations of the right-of-way permit issued by the BLM. The Tule facility initiated construction on December 6, 2016. The notice to stop construction was issued on January 20, 2017. Construction has now resumed. Both the notice to suspend construction and to resume construction, which includes Iberdrola's response to the BLM, can be accessed by selecting the document links on this page, A portion of BLM's notice is provided below. 
13 Feb 2017

California Environmental Quality Act (CEQA) complaint filed against San Diego County Board of Supervisors

Wind_ord_ceqa_complaint_6-12-13_thumb The California Environmental Quality Act (CEQA) complaint was filed last week by Stephan C. Volker of Volker Law on behalf of two rural East County grassroots non-profit groups. It challenges the San Diego County Board of Supervisors' May 15th 4-1 vote approving the Wind Energy Ordinance and Plan Amendment that sacrifices predominantly low-income rural communities and valued resources for unreliable, intermittent, and expensive industrial-scale wind and solar projects.
12 Jun 2013

http://www.windaction.org/posts?location=California&topic=Impact+on+Landscape&type=Document
back to top