Video

Fire sparked by a wind turbine

The turbine that sparked the fire was part of the Juniper Canyon facility located in Klickitat County in Washington State. The project, which is owned and operated by Iberdrola Renewables (now Avangrid), was constructed in two phases during the period from 2010 to 2012. It consists of 128 turbines (63 in Phase 1; 65 in Phase 2) and has a total installed capacity of 251.2 MW.

JUL 22 2019
http://www.windaction.org/posts/50051-fire-sparked-by-a-wind-turbine
back to top