Picture

Settlers Trail Wind Farm - Blade Failure 2

The Settlers Trail Wind Farm, operational since Spring 2012, experienced blade failure. The facility, located near Sheldon in Iroquois County, Illinois, is owned and operated by Germany-based E.On Climate & Renewables. It consists of 94 General Electric 1.6 MW Turbines for a nameplate capacity of 150.4 MW.

JUN 17 2012
http://www.windaction.org/posts/34121-settlers-trail-wind-farm-blade-failure-2
back to top