Picture

Wind Turbine Being Assembled

Workers atop a generating unit near Bickleton, Klickitat County, wait to guide rotors into place 262 feet above the ground. Once assembled, the final structure is 357 feet tall.

JUN 19 2006
http://www.windaction.org/posts/3119-wind-turbine-being-assembled
back to top