Picture

Blade destroyed in high winds

The blade on a General Electric 1.5 megawatt (MW) wind turbine at the Wessington Springs Wind Farm was shredded in high winds. The Babcock and Brown installation became operational in late fall 2008 and includes 34 towers.

AUG 20 2009
http://www.windaction.org/posts/22070-blade-destroyed-in-high-winds
back to top