ISO-NE Load Forecast Methodology

This presentation indicates that for New England the increasing demand for summer-time electricity is greater and increasing faster than winter-time demand. The fast-rising need for power in summer will likely result in construction of new power plants to keep ahead of demand - although inland industrial wind plants will not be able to contribute much to this demand period due to their very low capacity factor during summer months.

Iso Ne Load Forecasting

Download file (245 KB) ppt

DEC 19 2003
back to top