Pictures
Wind Turbine Being Assembled
June 19, 2006
Credits: Alan Berner / The Seattle Times
Credits: Alan Berner / The Seattle Times
Description:
Workers atop a generating unit near Bickleton, Klickitat County, wait to guide rotors into place 262 feet above the ground. Once assembled, the final structure is 357 feet tall.
Click to download full sized image
| File name: | 2003070104.jpg |
| File size: | 11.62 kB |
| Width x Height: | 200 x 291 pixels |
Filed under
:
Washington
:
General
| « prev | next » |
Note: this image may be subject to the Fair Use Notice.

