Home | Contact | Text size: s M L
facts, analysis, exposure of wind energy's real impacts

Pictures

Vestas turbine blades shredded in high winds
April 26, 2012
Description:
Two blades shattered on a recently installed Vestas V90 1.8 MW under windy conditions. Blade debris was thrown more than 1000 feet from the turbine site in a working farm field. The turbine was part of the Timber Road II facility located in Ohio just beyond the Indiana state line. The project is owned by Portuguese-based EDP Renewables.
Vestas turbine blades shredded in high winds
Click to download full sized image
File name: Payne,OH Wind Turbine Damage 4-24-2012 011.jpg
File size: 121.51 kB
Width x Height:1024 x 768 pixels

« prev     next »
Note: this image may be subject to the Fair Use Notice.