Pictures
Vestas turbine blades shredded in high winds
April 26, 2012
Description:
Two blades shattered on a recently installed Vestas V90 1.8 MW under windy conditions. Blade debris was thrown more than 1000 feet from the turbine site in a working farm field. The turbine was part of the Timber Road II facility located in Ohio just beyond the Indiana state line. The project is owned by Portuguese-based EDP Renewables.
Click to download full sized image
| File name: | Payne,OH Wind Turbine Damage 4-24-2012 011.jpg |
| File size: | 121.51 kB |
| Width x Height: | 1024 x 768 pixels |
| « prev | next » |
Note: this image may be subject to the Fair Use Notice.

