This is a stiff wind turbine, and Kittery is in a low wind speed regime. The committee looked at the cost of the three turbines proposed and almost totally ignored if it would produce the power. Saco has a wind regime that is about 10-15 percent than higher than Kittery's wind. This turbine should be installed at 50 meters - another 35-plus feet higher than the permit calls for. ...A comparison of the three machines was provided in table format by Seacoast Consulting, but the most important piece of data on the three proposals - the cut on wind speed was not in the comparison. The committee chose the machine based solely on the cost.
If Kittery were purchasing a boat and a bid came in at a cost of $190,000 and the other came in at $210,000, and the seller of the two boats did not tell you that the first boat would not float but the second boat was sea worthy, it would be a poor choice to buy the cheaper boat. Kittery should do the same with a wind turbine. Buy a turbine that will turn - not one that will sit there for all but two-three months and not turn.
January 29, 2008
by Suzanne Sayer, Ph.D.
in Seacoast Online
I am 100 percent pro-wind, but 50 percent against this particular turbine (EW-15) being installed in Kittery at the height they are asking for. The EW-15 has been installed at two other locations in Maine. One (Blueberry processor in Orland, Maine) took it down because of bad PR - it did not turn.
This is a stiff wind turbine, and Kittery is in a low wind speed regime. The committee looked at the cost of the three turbines proposed and almost totally ignored if it would produce the power. Saco has a wind regime that is about 10-15 percent higher... [continue via Web link]