News

Structural Failure and California
Browse in : All > Topics > Safety > Structural Failure (118)
All > Location > USA > California (431)
Any of these categories
[ Safety ]

Windmill disintegrates

Posted by: Lisa on May 11, 2009 5:07:24 PM
The windturbine that started spinning wildly on May 3 disintegrated two or three days later, according to the California Highway Patrol. All that is left now is a turbine-less twisted tower. The CHP closed Highway 58 for hours after it was notified that the turbine was spinning out of control on Sunday. The closure snarled traffic in the area.
Note : http://www.tehachapinews.com/home/ViewPost/99979
Read More (307  words )
[ Safety ]

Wild windmill shuts down part of Highway 58 indefinitely

Posted by: Lisa on May 04, 2009 8:44:18 AM
A faulty windmill near Tehachapi shuts down all lanes of Highway 58 between highways 202 and 14; and CHP Officers say it could be days before the roadway re-opens. Mojave CHP got the call about the out-of-control windmill located in the Tehachapi Wind Farm a little after 1:20 Sunday afternoon.
Note : http://www.bakersfieldnow.com/news/local/44289232.html
Read More (412  words )
[ Safety ]

58 still closed by runaway windmill

Posted by: Lisa on May 03, 2009 12:36:16 AM
A runaway windmill in Tehachapi closed Highway 58 -- a major east-west freeway connecting California's southern Central Valley to Las Vegas, Nevada and Arizona -- for most of the day Sunday. As of 6:45 p.m., the highway remained closed between Tehachapi and Mojave. Officials had no estimate as to when it might reopen
Note : http://www.bakersfield.com/news/local/x443328764/Windmill-closes-58-eastbound
Read More (398  words )
[ Safety ]

Windmill falls over in North Palm Springs

Posted by: Lisa on May 01, 2009 2:52:46 PM
It could be a major safety hazard, windmills near the 1-10 in North Palm Springs crashing down to the ground. It happened yesterday, and now there's an investigation as to why the wind turbine, nearly 200 feet fell. "It went into overspeed, some sort of maintainence or some sort of malfunction," said Jeff Welton of the Palm Springs based Wintec Energy.
Note : http://www.kpsplocal2.com/Global/story.asp?S=10290223
Read More (275  words )
[ Safety | Ohio ]

Redriven wind turbines continue to fall apart

Posted by: Lisa on March 18, 2009 5:24:27 PM
This news report was submitted to Windaction.org by Scott Jackson, a reseller of Redriven windmills. Mr. Jackson is seeking to get the Redriven turbine de-certified in the State of California for safety reasons.
Note : http://www.powershacks.com/index.php?pg=wind2
Read More (423  words )
[ Safety ]

Windmill repair update; A city investigation continues

Posted by: Lisa on January 29, 2009 6:49:27 AM
City officials continue to investigate and keep tabs on how a Florida power company is meeting requirements for repairing their damaged and malfunctioning windmills here. ...FPL/NER owns and operates approximately 60 wind turbines in question. It's astonishing that there is a reported 40 percent that are malfunctioning, in disrepair, or need maintenance.
Note : http://desertvalleystar.com/article.php?a=72
Read More (489  words )
[ Safety ]

Flames lap Oak Creek pass

Posted by: hughkemper on June 03, 2006 7:26:51 AM
The fire was caused by burning debris from a wind turbine that caught fire due to a malfunction.
Note : http://www.tehachapinews.com/home/viewarticle.php?cat_id=383&post=16666
Read More (354  words )