News
Wind power meeting today focuses on setbacks
A state siting board will hear comments today to consider whether new setbacks should be required for the Kittitas Valley Wind Power Project.
The Energy Facility Site Evaluation Council will hold two sessions today, from 3-5 p.m. and 6:30-9:30 p.m., at the Teanaway Hall, Kittitas County Event Center, in Ellensburg.
In May, EFSEC recommended Gov. Chris Gregoire to approve the project, allowing up to 65 wind turbines to be built by Horizon Wind Energy of Houston along ridges on either side of Highway 97 outside of Ellensburg. The turbines would be the size of old-growth firs and have propeller blades up to 145 feet long.
However, the governor asked for the setbacks to be reconsidered by EFSEC, which had required setbacks of four times the height of the turbines for non-participating residences.
July 17, 2007
in Yakima Herald-Republic
A state siting board will hear comments today to consider whether new setbacks should be required for the Kittitas Valley Wind Power Project.
The Energy Facility Site Evaluation Council will hold two sessions today, from 3-5 p.m. and 6:30-9:30 p.m., at the Teanaway Hall, Kittitas County Event Center, in Ellensburg.
In May, EFSEC recommended Gov. Chris Gregoire to approve the project, allowing up to 65 wind turbines to be built by Horizon Wind Energy of Houston along ridges on either side of Highway 97 outside of Ellensburg. The turbines would be the size of old-growth firs and have propeller blades up to... [continue via Web link]
| < prev | next > |
Note: this article may be subject to the Fair Use Notice.

