Documents
Court Order voids Antrim Wind LLC PILOT agreement with Town of Antrim New Hampshire
May 19, 2013
by David A. GarfunNH kel, Presiding Judge Hillsbouough Superior Count Northern District
NH Superior Court has found that the Town of Antrim was in viloation of the State's Right to Know law by conducting numerious unnoticed, non-public meetings to negotiate the PILOT agreement between the Town and Antrim Wind LLC, a company seeking to erect a wind energy facility in the Town. A portion of the ruling is provided below. The full order can be accessed by clicking on the link at the bottom of this page.
Also filed under [
Legal|
New Hampshire]
Adverse health effects of industrial wind turbines
April, 2013
by Roy D. Jeffery, MD FCFP, Carmen Krogh, Brett Horner, CMA
This peer-reviewed paper published in the Journal of the College of Family Physicians of Canada examines the health impacts of industrial-scale wind turbines when sited in proximity of where people live. The introduction and conclusion of the paper is excerpted below. The full report can be accessed by clicking on the links at the bottom of this page.
Abstract: Green technologies (e.g. wind turbines, solar cells, and biofuels) and initiatives (e.g. efficiency, recycling, and organics) yield distinct unanticipated consequences that can partially or fully offset intended environmental benefits.
The New York State fleet of wind turbines with an installed capacity of 1,634 megawatts, on average across all projects, operated at under 25% annual capacity factor since 2009.
Assessing the Efficiency and Effectiveness of Wind Energy Incentives
April 16, 2013
by Subcommittee on Oversight and Subcommittee on Energy
The U.S. House Subcommittee on Oversight and Subcommittee on Energy conducted an informative hearing on wind energy. The charter of the hearing, the witnesses who appeared and links to their testimony as well as detailed background information on the purpose of the hearing were released in this document prepared by staffers for the Committee.
Also filed under [
Energy Policy|
USA]
New Era Wind letter requesting the MN PUC suspend further consideration of the project
April 17, 2013
by Peter Mastic
This letter was sent to the Minnesota Public Utilities Commission in reference to the Goodhue Wind project proposal now known as the New Era Wind Farm. New Era explains that it has initiated discussions to assign its power contracts to a third-party wind project developer and site. It further requests that any further evidentiary procedures with respect to the the project before the PUC be placed on hold. It appears from the letter that the project will be sold or canceled.
Lawsuit: Searchlight Wind Energy Project complaint
April 13, 2013
by Attorneys Stacy D. Harrop and David H. Becker
Environmental groups and residents of Nevada have filed a complaint in U.S. District Court of Nevada challenging the Department of the Interior's permit granting Duke Energy permission to construct an 87-turbine wind energy facility east of Searchlight on 19,000 acres of Bureau of Land Management land. Excerpts of the complaint are provided below. The plaintiffs argue that Former Interior Secretary Ken Salazar acted in a manner that was arbitrary, capricious, an abuse of discretion and contrary to law. The full complaint can be accessed by clicking on the link(s) at the bottom of this page.
Iberdrola Groton Wind: Mechanics Lien Filed Against the Wind Project and Owner
April 3, 2013
by Alvin J. Coleman & Son
Alvin J. Coleman & Son has filed a Mechanics Lien in the State of New Hampshire for the amount of $3,490,781. The Lien was filed against Cianbro Corporation, Groton Wind LLC, Iberdrola Renewables LLC, Iberdrola Energy Projects Inc, Yankee Forest Limited Liability Company and others. The full document can be accessed by clicking on the link(s) at the bottom of this page.
Also filed under [
General|
New Hampshire]
Comparing bird and bat fatality-rate estimates among North American wind-energy projects
March 30, 2013
by K. Shawn Smallwood
The Wildlife Society's March Bulletin included this impacting paper by Dr. Shawn Smallwood who compares post-construction bird and bat fatality assessments conducted across the United States. He estimates 888,000 bat and 573,000 bird fatalities/year (including 83,000 raptor fatalities) at 51,630 megawatt (MW) of installed wind-energy capacity in the United States in 2012. As wind energy continues to expand, there is urgent need to improve fatality monitoring methods and address the levels of mortality.
Also filed under [
Impact on Wildlife|
USA]
IRS PTC Rules Notice 2013-29
April 18, 2013
by Brian J. Americus of the Office of Associate Chief Counsel (Passthroughs & Special Industries)
This notice provides two methods that a taxpayer may use to establish that construction of a qualified facility has begun. A taxpayer may establish the beginning of construction by starting physical work of a significant nature as described in section 4. Alternatively, a taxpayer may establish the beginning of construction by meeting the safe harbor provided in section 5 (Safe Harbor). Although a taxpayer may satisfy both methods, a taxpayer need only satisfy one method to establish that construction of a facility has begun for the purpose of qualifying for the PTC or ITC.
Also filed under [
Tax Breaks & Subsidies|
USA]