Adverse health effects of industrial wind turbines
April, 2013
by Roy D. Jeffery, MD FCFP, Carmen Krogh, Brett Horner, CMA
This peer-reviewed paper published in the Journal of the College of Family Physicians of Canada examines the health impacts of industrial-scale wind turbines when sited in proximity of where people live. The introduction and conclusion of the paper is excerpted below. The full report can be accessed by clicking on the links at the bottom of this page.
The New York State fleet of wind turbines with an installed capacity of 1,634 megawatts, on average across all projects, operated at under 25% annual capacity factor since 2009.
IRS PTC Rules Notice 2013-29
April 18, 2013
by Brian J. Americus of the Office of Associate Chief Counsel (Passthroughs & Special Industries)
This notice provides two methods that a taxpayer may use to establish that construction of a qualified facility has begun. A taxpayer may establish the beginning of construction by starting physical work of a significant nature as described in section 4. Alternatively, a taxpayer may establish the beginning of construction by meeting the safe harbor provided in section 5 (Safe Harbor). Although a taxpayer may satisfy both methods, a taxpayer need only satisfy one method to establish that construction of a facility has begun for the purpose of qualifying for the PTC or ITC.
Also filed under [
Tax Breaks & Subsidies|
USA]
New Era Wind letter requesting the MN PUC suspend further consideration of the project
April 17, 2013
by Peter Mastic
This letter was sent to the Minnesota Public Utilities Commission in reference to the Goodhue Wind project proposal now known as the New Era Wind Farm. New Era explains that it has initiated discussions to assign its power contracts to a third-party wind project developer and site. It further requests that any further evidentiary procedures with respect to the the project before the PUC be placed on hold. It appears from the letter that the project will be sold or canceled.
Hearing assessing the efficiency and effectiveness of wind energy incentives: Testimony of Robert Michaels PhD
April 16, 2013
by Robert Michaels PhD
Economist Robert Michaels PhD presented this important testimony at a hearing before the Oversight Subcommittee and Energy Subcommittee of the Committee on Space, Science, and Technology. Dr. Michaels addresses the inefficiencies of wind energy and high costs of the technology. The purpose of his testimony is provided below. To access the full testimony, click on the link(s) at the bottom of this page.
Assessing the Efficiency and Effectiveness of Wind Energy Incentives
April 16, 2013
by Subcommittee on Oversight and Subcommittee on Energy
The U.S. House Subcommittee on Oversight and Subcommittee on Energy conducted an informative hearing on wind energy. The charter of the hearing, the witnesses who appeared and links to their testimony as well as detailed background information on the purpose of the hearing were released in this document prepared by staffers for the Committee.
Also filed under [
Energy Policy|
USA]
Lawsuit: Searchlight Wind Energy Project complaint
April 13, 2013
by Attorneys Stacy D. Harrop and David H. Becker
Environmental groups and residents of Nevada have filed a complaint in U.S. District Court of Nevada challenging the Department of the Interior's permit granting Duke Energy permission to construct an 87-turbine wind energy facility east of Searchlight on 19,000 acres of Bureau of Land Management land. Excerpts of the complaint are provided below. The plaintiffs argue that Former Interior Secretary Ken Salazar acted in a manner that was arbitrary, capricious, an abuse of discretion and contrary to law. The full complaint can be accessed by clicking on the link(s) at the bottom of this page.
Victorian Civil Administrative Tribunal (VCAT) ruling on the Cherry Tree Wind Farm Pty Ltd
April 10, 2013
by Victorian Civil Administrative Tribunal (VCAT)
The Victorian Civil Administrative Tribunal (VCAT) ruling on the Cherry Tree Wind Farm Pty Ltd proposal to erect 16 industrial scale wind turbines (3.5 MW each). This ruling is unique in that the Commissioners deferred a decision on the impact of the project on human health until further, planned studies can be conducted at a project with similarly sized turbines.
Also filed under [
General|
Australia / New Zealand]
Iberdrola Groton Wind: Mechanics Lien Filed Against the Wind Project and Owner
April 3, 2013
by Alvin J. Coleman & Son
Alvin J. Coleman & Son has filed a Mechanics Lien in the State of New Hampshire for the amount of $3,490,781. The Lien was filed against Cianbro Corporation, Groton Wind LLC, Iberdrola Renewables LLC, Iberdrola Energy Projects Inc, Yankee Forest Limited Liability Company and others. The full document can be accessed by clicking on the link(s) at the bottom of this page.
Also filed under [
General|
New Hampshire]
Mason County wind farm neighbors sue Consumers Energy: Complaint Filed
April 1, 2013
by Craig W. Horn and David L. Puskar, Attorneys for the Plaintiffs
This lawsuit filed against Consumers Energy Company, owner of the Lake Winds Energy Park consisting of fifty-six Vestas V100 1.8 megawatt turbines with a total installed capacity of 100.8 megawatts. An excerpt of the complaint is provided below. The full complaint can be accessed by clicking on the links at the bottom of this page.