Documents
Category:
New Hampshire
Audubon Society of NH comments regarding Coos County wind proposal
February 27, 2009
by Michael J. Bartlett, President
The Audubon Society of New Hampshire submitted comments to the New Hampshire Site Evaluation Committee in response to a proposal pending before the committee. The proposal, known as the Granite Reliable Power (GRP, LLC) Wind Park, seeks to erect thirty-three 3.0MW turbines along the Kelsey, Owlshead, and Dixville peaks located in Coos County, NH. GRP, LLC is owned by Noble Environmental Power.
Also filed under [
Impact on Wildlife|
Impact on Landscape]
Below are two Phase I Avian Risk Assessments reports, prepared by Paul Kerlinger, for Vermont's East Haven Wind Farm (July 2003) and New Hampshire's Lempster Mountain Wind Power Project (June 2005). Phase I assessments have proven inadequate in assessing mortality at several sites in the U.S. including Mountaineer in West Virginia and Meyersdale in Pennsylvania. The US Fish and Wildlife Interim Wind/Wildlife Guidelines calls for multi-year evaluation of avian and bat activity using remote sensing.
Bird and Bat Studies Conducted at Proposed or Existing Windpower Facilities
February, 2007
by Pennsylvania Department of Conservation and Natural Resources
This document includes studies in Maine, Maryland, Minnesota, New Hampshire, New York, Pennsylvania, Vermont, Virginia and West Virginia.
Also filed under [
Impact on Wildlife|
Impact on Birds|
Impact on Bats|
Maryland|
Maine|
Minnesota|
New York|
Pennsylvania|
Virginia|
Vermont|
West Virginia]
Comments to FERC by the New England Conference of Public Utility Commissions and the Vermont Department of Public Service
Coos County Wind proposal: Letters exchanged between County treasurer and NH Attorney General
April 15, 2009
Also filed under [
Zoning/Planning]
...the MEA Report can be used to estimate the value (avoided emissions) of Renewable Energy Certificates (REC) by providing both REC suppliers and stakeholders with information that can be used to communicate the environmental benefits of RECs and works to enhance the overall REC marketplace.
Editor's Note: As noted below under Methodology [emphasis added], this report appears to substantiate the point that wind energy would not backdown "baseload" generation.
Editor's Note: As noted below under Methodology [emphasis added], this report appears to substantiate the point that wind energy would not backdown "baseload" generation.
Also filed under [
General|
Pollution|
Tax Breaks & Subsidies|
Energy Policy|
Connecticut|
Massachusetts|
Maine|
Rhode Island|
Vermont]
Establishing Wind Power In New Hampshire: Effectively Siting Turbines
2005
by Rockefeller Center at Dartmouth College Policy Research Shop
With the emergence of recent proposals, there appears to be growing interest in expanding
renewable energy sources in New Hampshire. New Hampshire’s government has taken several steps
to encourage the use of renewables, including setting net metering guidelines for small-scale
generators (less than 25 kW) of photovoltaics, hydroelectric, and wind.1 Net metering guidelines in
New Hampshire require that utilities purchase any electricity generated by small scale generators in
excess of what they use. Further developing renewables beyond small-scale generation, particularly
wind, can help New Hampshire increase the proportion of energy generated from renewable
sources. In fact, developing the
full potential of wind resources in
the state holds great promise for
helping to meet the state’s energy
needs.
Also filed under [
Zoning/Planning]
FWS letter responds to Lempster Wind (NH) preconstruction studies
January 31, 2008
by Michael J. Bartlett
This presentation indicates that for New England the increasing demand for
summer-time electricity is greater and increasing faster than
winter-time demand. The fast-rising need for power in summer will
likely result in construction of new power plants to keep ahead of
demand - although inland industrial wind plants will not be able to contribute much
to this demand period due to their very low capacity factor during
summer months.
Lempster Mountain Wind Power Project: Direct Pre-filed Testimony of Lisa Linowes
February 7, 2007
by Lisa Linowes
Why did you petition to become an intervenor in this matter before the NH SEC?
With New Hampshire’s recent reinstatement of PILOT agreements and legislative efforts to a Renewable Portfolio Standard, the regulatory groundwork is being laid for more wind facilities to enter the state. Yet, New Hampshire, like many states, has no consistent regulatory process in place for reviewing these projects to ensure our environmental, societal, and economic interests are protected. The work the NH SEC has agreed to undertake in reviewing this application is precedent setting. How the committee approaches its review and the weight it places on arguments presented by all sides will impact other developments in the State as pertains to renewable energy projects.
There are a multitude of conflicting issues at play when considering any wind project. My commitment to this process is to help provide, to the best of my ability, valuable and timely information that will assist the Committee in making an informed decision on this application.
Also filed under [
General|
Impact on Wildlife|
Impact on Birds|
Impact on Landscape|
Pollution|
Impact on Space|
Energy Policy]
| << Nevada | New Jersey >> |