Documents
Category:
Minnesota or New Hampshire
Browse in :
All
> Location
> USA
> Minnesota (4)
All > Location > USA > New Hampshire (14)
All of these categories
All > Location > USA > New Hampshire (14)
All of these categories
Memo from the Massachusetts Department of Public Utilities Chairman, Paul Hibbard, to the ISO New England. Chairman Hibbard expresses his concerns over the push to regionalize costs for building expensive transmission lines to service renewable projects (wind) built far from load centers. Current FERC rules are unclear on how to justify distribution of the costs across all ratepayers within the region unless it can be shown such transmission is needed to ensure the reliability and integrity of the grid.
Also filed under [
Energy Policy|
Connecticut|
Massachusetts|
Maine|
New Hampshire|
Rhode Island|
Vermont]
AN ORDINANCE ESTABLISHING A 90-DAY MORATORIUM WITHIN THE CITY OF FERGUS FALLS ON THE CONSTRUCTION OF WIND ENERGY CONVERSION SYSTEMS (WECS), THEREBY AMENDING CHAPTER 7 ENTITLED ZONING AND SUBDIVIDING, BY ADDING A NEW SECTION 7.43 FOR THAT PURPOSE; AND, BY ADDING BY REFERENCE, CITY CODE CHAPTER 1 AND SECTION 7.99 WHICH, AMONG OTHER THINGS CONTAIN PENALTY PROVISIONS.
Also filed under [
Zoning/Planning|
Minnesota]
FWS letter responds to Lempster Wind (NH) preconstruction studies
January 31, 2008
by Michael J. Bartlett
Minnesota PUC: Permit standards for siting wind generation projects less than 25 MW
January 11, 2008
At its August 23, 2007 meeting, the Minnesota Public Utilities Commission requested that the Department of Commerce's Energy Facility Permitting staff consult with stakeholders and prepare for the Commission's consideration general permit standards and setback recommendations to satisfy the legislative mandate. The PUC issued this order on Jan 11, 2008.
Also filed under [
Energy Policy|
Minnesota]
Also filed under [
General|
Connecticut|
Massachusetts|
Maine|
New Hampshire|
Rhode Island|
Vermont]
In July 2007, the New Hampshire Site Evaluation Committee (SEC) permitted, with conditions, the Lempster Wind LLC project owned by Iberdrola. The project will consist of twelve 2 MW Gamesa turbines along five miles of access roads. Iberdrola is now shopping around its neighbor agreement to non-participating landowners asking them to waive noise protections the SEC conditioned in the permit, among other protections. Iberdrola's agreement can be downloaded from the link below.
Also filed under [
General|
New Hampshire]
These public comments were filed with the New Hampshire Site Evaluation Committee in reference to the Lempster Wind proposal (NH SEC Docket 2006-01 - Lempster, NH). Ms. Martin's comments were prepared following interviews she had with residents living near the Mars Hill, Maine commerical wind project. The Mars Hill wind project went on line in early 2007; problems of noise were reported as early as December 2006.
Bird and Bat Studies Conducted at Proposed or Existing Windpower Facilities
February, 2007
by Pennsylvania Department of Conservation and Natural Resources
This document includes studies in Maine, Maryland, Minnesota, New Hampshire, New York, Pennsylvania, Vermont, Virginia and West Virginia.
Also filed under [
Impact on Wildlife|
Impact on Birds|
Impact on Bats|
Maryland|
Maine|
Minnesota|
New Hampshire|
New York|
Pennsylvania|
Virginia|
Vermont|
West Virginia]
Lempster Mountain Wind Power Project: Direct Pre-filed Testimony of Lisa Linowes
February 7, 2007
by Lisa Linowes
Why did you petition to become an intervenor in this matter before the NH SEC?
With New Hampshire’s recent reinstatement of PILOT agreements and legislative efforts to a Renewable Portfolio Standard, the regulatory groundwork is being laid for more wind facilities to enter the state. Yet, New Hampshire, like many states, has no consistent regulatory process in place for reviewing these projects to ensure our environmental, societal, and economic interests are protected. The work the NH SEC has agreed to undertake in reviewing this application is precedent setting. How the committee approaches its review and the weight it places on arguments presented by all sides will impact other developments in the State as pertains to renewable energy projects.
There are a multitude of conflicting issues at play when considering any wind project. My commitment to this process is to help provide, to the best of my ability, valuable and timely information that will assist the Committee in making an informed decision on this application.
Also filed under [
General|
Impact on Wildlife|
Impact on Birds|
Impact on Landscape|
Pollution|
Impact on Space|
Energy Policy|
New Hampshire]
Below are two Phase I Avian Risk Assessments reports, prepared by Paul Kerlinger, for Vermont's East Haven Wind Farm (July 2003) and New Hampshire's Lempster Mountain Wind Power Project (June 2005). Phase I assessments have proven inadequate in assessing mortality at several sites in the U.S. including Mountaineer in West Virginia and Meyersdale in Pennsylvania. The US Fish and Wildlife Interim Wind/Wildlife Guidelines calls for multi-year evaluation of avian and bat activity using remote sensing.